WELL · 42-199-33415 · DISTRICT 3

BP America A-39 #3

Y

Hardin County · Van Meter (Yegua Cons.) field · Producing  · Directional

BP America A-39 #3 (API 42-199-33415) is a well in Hardin County operated by Whitehead Resources Ltd., completed April 4, 2016 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued January 25, 2013, permitted to 10,200 ft.

It was permitted by Century Exploration Houston, LLC and has since transferred to Whitehead Resources Ltd. on the wellbore schedule.

Completion filings report 9 formation tops, including Hackberry, Nodosaria, Vicksburg, Jackson.

No lease production has been reported under this well’s leases.

Operator of record

Whitehead Resources Ltd.

Permitted by Century Exploration Houston, LLC; the EWA schedule now lists a different operator.

Buna, TX · P-5 Y, filed Oct 4, 2025 · 41 permits on file · (409) 656-4688

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWhitehead Resources Ltd.
Production reportsWhitehead Resources, Ltd.through Apr 2026
Latest permitCentury Exploration Houston, LLCJan 25, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,200
total depth, ft
1
permits on file
Jan 25, 2013
last permit issued
Apr 4, 2016
completed
0
cumulative oil, bbl
1.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 4, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
BP America 'A-39' G-3-278175Van Meter (Yegua Cons.)Whitehead Resources, Ltd.101.36MMay 2013 – Jul 2026

Gas, mcf lease total

Last 12 months 53,326 · prior 12 46,569(+15%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Century Exploration Houston, LLCMay 2013 → Jan 2016
  2. 2Upstream Exploration LLCFeb 2016 → Oct 2019
  3. 3Southern Oil of Louisiana LLCNov 2019 → Apr 2021
  4. 4Whitehead Resources, Ltd.Jun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
755243-99DrillCentury Exploration Houston, LLCJan 22, 2013Jan 25, 2013Feb 11, 201310,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-278175————

Formation tops

As filed on W-2/G-1. Subsea from 23 ft elevation.Download CSV →

FormationMD ftSubsea
Hackberry5,375-5,352
Nodosaria5,865-5,842
Vicksburg6,065-6,042
JacksonJACKSON SHALE7,285-7,262
Moody's Branch7,755-7,732
Cockfield8,025-8,002
Mako8,145-8,122
YeguaYEGUA DY 48,345-8,322
YeguaYEGUA DY 4/68,345-8,322
YeguaYEGUA EY 2/48,620-8,597
Nod Mex 18,875-8,852

Perforations

Perforated and open-hole intervals.

FromToType
8,4628,472Perforated
8,6788,694Perforated
9,2229,229Perforated
9,5639,596Perforated
9,6189,630Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,74013.51,470 S
7.6259,1059.875670 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 28, 2016Jun 16, 2016—
00Oct 10, 2016Oct 23, 2015—
00Oct 21, 2015Feb 25, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19933415, documented in the API reference.