WELL · 42-201-07911 · DISTRICT 3
Michel, M. F. #4 D
Harris County · Vertical
Michel, M. F. #4 D (API 42-201-07911) is a permitted well in Harris County filed by Exxon Corp.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1978 and 1980, permitted to 6,518 ft.
Its 2 leases have reported 207K barrels of oil and 326K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Jan 3, 2003 · 19,549 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Tandem Energy Corporationthrough Apr 2026 |
| Latest permit | Exxon Corp.Aug 18, 1980 |
- 6,518
- total depth, ft
- 2
- permits on file
- Aug 18, 1980
- last permit issued
- —
- completed
- 207K
- cumulative oil, bbl
- 326K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Michel, M. F. O-3-8382 | Tomball (Schultz SE.) | Tandem Energy Corporation | 2 | 174K | 244K | Jan 1993 – Jul 2026 |
| Tomball Petrich Sd. Oil Unit #1 O-3-8775 | Tomball (Petrich) | Tandem Energy Corporation | 1 | 33.6K | 82.8K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 770 · prior 12 2,143(-64%)
Gas, mcf lease total
Last 12 months 4,379 · prior 12 4,379(+0%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Jul 1996
- 2MerencoAug 1996 → Dec 1996
- 3Tandem Energy CorporationJan 1997 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 92949-99 | Recompletion | Exxon Corp. | Aug 18, 1980 | Aug 18, 1980 | — | 6,518 |
| 28757-99 | Recompletion | Exxon Corp. | Jul 19, 1978 | Jul 19, 1978 | Apr 3, 1979 | 6,518 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-8382 | — | — | — | — |
| — | — O-3-8775 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,494 | 5,504 | Perforated |
| — | 5,568 | Perforated |
| — | 6,158 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,027 | 15 | 500 S |
| 2.375 | 5,396 | — | — |
| 2.375 | 5,591 | — | — |
| 2.875 | 6,449 | 9.875 | 400 S |
| 4.5 | 6,456 | 9.875 | 625 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Nov 3, 1980 | — |
| 00 | Jan 12, 1984 | Nov 19, 1975 | — |
| 00 | Jan 12, 1984 | Jul 19, 1967 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-07911 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-07911 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20107911, documented in the API reference.