WELL · 42-201-31627 · DISTRICT 3

Exxon-West Fee C a/C 1 #86

Y

Harris County · Clear Lake W. (Frio) field · Gas Strg-Injection  · Vertical

Exxon-West Fee C A/C 1 #86 (API 42-201-31627) is a well in Harris County operated by Kinder Morgan Tejas Pipeline LLC, completed October 9, 2012 and listed as gas strg-injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 14, 1983, permitted to 6,420 ft.

It was permitted by Exxon Corp. and has since transferred to Kinder Morgan Tejas Pipeline LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Marg.2, Marginulina 2 Sand, Marg.3, Marginulina 3 Sand.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

Kinder Morgan Tejas Pipeline LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 4, 2026 · 20 permits on file · (800) 568-7512

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKinder Morgan Tejas Pipeline LLC
Production reportsKinder Morgan Tejas Pipeline LLCthrough Dec 2020
Latest permitExxon Corp.Sep 14, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,420
total depth, ft
1
permits on file
Sep 14, 1983
last permit issued
Oct 9, 2012
completed
0
cumulative oil, bbl
1.74M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 9, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Exxon-West Fee "C" a/C 1 G-3-109447Clear Lake, W. (Frio)Kinder Morgan Tejas Pipeline LLC101.74MJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Aug 1993
  2. 2Tejas Gas Pipeline, L.P.Jul 1999 → Jan 2000
  3. 3Shell Gas Gathering, LLC.Dec 2003 → Jan 2004
  4. 4Pelican Transmission, LLCNov 2004 → Mar 2012
  5. 5Kinder Morgan Tejas Pipeline LLCAug 2012 → Dec 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
215936-99DrillExxon Corp.Aug 11, 1983Sep 14, 1983—6,420

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-109447————

Formation tops

As filed on W-2/G-1. Subsea from 43 ft elevation.Download CSV →

FormationMD ftSubsea
MARG.25,370-5,327
Marginulina 2 Sand5,370-5,327
MARG.35,439-5,396
Marginulina 3 Sand5,439-5,396
Frio5,464-5,421

Perforations

Perforated and open-hole intervals.

FromToType
5,5305,560Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,52614.751,015 S
75,9829.875390 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 24, 2015Sep 2, 2014—
00Mar 27, 1984Mar 12, 1984—
00Mar 21, 1984Mar 12, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.98K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000084027H-1 InjectionActive005,504–5,560

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20131627, documented in the API reference.