WELL · 42-201-31793 · DISTRICT 3

Hirsch State #20

Y

Harris County · Goose Creek field · NO Production  · Vertical

Hirsch State #20 (API 42-201-31793) is a well in Harris County operated by Gaither Petroleum Corporation, completed October 20, 1984 and listed as no production on the RRC schedule.

The RRC has issued one drilling permit, issued July 19, 1984, permitted to 5,100 ft.

It was permitted by Gulf Oil Corp. and has since transferred to Gaither Petroleum Corporation on the wellbore schedule.

Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.

Its lease has reported 154K barrels of oil and 9.87K mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Gaither Petroleum Corporation

Permitted by Gulf Oil Corp.; the EWA schedule now lists a different operator.

Katy, TX · P-5 Y, filed Nov 4, 2025 · 117 permits on file · (281) 830-7878

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGaither Petroleum Corporation
Production reportsSiempre Energy Operating, LLCthrough Mar 2016
Latest permitGulf Oil Corp.Jul 19, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,100
total depth, ft
1
permits on file
Jul 19, 1984
last permit issued
Oct 20, 1984
completed
154K
cumulative oil, bbl
9.87K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 20, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hirsch State O-3-1775Goose CreekGaither Petroleum Corporation5154K9.87KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Petroleum CompanyJan 1993 → Jan 1995
  2. 2Pennzoil Exploration & Prod. Co.Feb 1995 → Feb 1999
  3. 3Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Nov 1999
  4. 4Gaither Petroleum CorporationDec 1999 → Mar 2004
  5. 5LA-Tex Operating CompanyApr 2004 → Apr 2011
  6. 6Hollimon Oil CorporationMay 2011 → Apr 2015
  7. 7Siempre Energy Operating, LLCJul 2015 → Mar 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
245602-99DrillGulf Oil Corp.Jul 18, 1984Jul 19, 1984Oct 11, 19845,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-1775————

Formation tops

As filed on W-2/G-1. Subsea from 3 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE3,006-3,003
Frio4,320-4,317

Perforations

Perforated and open-hole intervals.

FromToType
4,4204,436Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,13214.75700 S
74,7289.875425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 1985Nov 9, 1984—
00Jan 5, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20131793, documented in the API reference.