WELL · 42-201-32028 · DISTRICT 3
White #1
Harris County · Vertical
White #1 (API 42-201-32028) is a permitted well in Harris County filed by Mccarter, A. Nelson; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1984 and 1986, permitted to 6,500 ft.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Its 2 leases have reported 19.1K barrels of oil and 30.1K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Apr 5, 2002 · 54 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | General Oil Company, Inc.through Jun 1996 |
| Latest permit | McCarter, A. NelsonMar 13, 1986 |
- 6,500
- total depth, ft
- 2
- permits on file
- Mar 13, 1986
- last permit issued
- —
- completed
- 19.1K
- cumulative oil, bbl
- 30.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Estopinal, Joyce H. O-3-18195 | Mykawa New | Crudecorp, Inc. | 2 | 19.1K | 30.1K | Jan 1993 – Jul 2026 |
| Estopinal, Joyce H. O-3-26991 | Mykawa (Cons.) | Crudecorp, Inc. | 1 | 0 | 0 | Jan 2016 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1McCarter, A. NelsonJan 1993 → Feb 1994
- 2General Oil Company, Inc.Mar 1994 → Jun 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 299567-99 | Drill | McCarter, A. Nelson | Mar 13, 1986 | Mar 13, 1986 | Jun 24, 1986 | 6,500 |
| 235206-99 | Drill | McCarter, A. Nelson | Apr 6, 1984 | Apr 9, 1984 | — | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-18195 | — | — | — | — |
| — | — O-3-26991 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 14 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 3,880 | -3,866 |
| Frio | 4,450 | -4,436 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,537 | 4,541 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,969 | 12.25 | 450 S |
| 4.5 | 4,648 | 7.875 | 146 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 26, 2016 | Nov 4, 1986 | Yes |
| 00 | Dec 1, 1986 | Nov 4, 1986 | Yes |
| 00 | Nov 20, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-32028 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-32028 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20132028, documented in the API reference.