WELL · 42-201-32094 · DISTRICT 3

Warren Ranch #4

Plugged

Harris County · Hockley field  · Vertical

Warren Ranch #4 (API 42-201-32094) is a plugged well in Harris County, plugged January 12, 1990, last operated by Northwest Energy Inc..

The RRC has issued one drilling permit, issued September 25, 1987, permitted to 175 ft.

Completion filings report one formation top, including Caprock.

Operator of record

Northwest Energy Inc.

Hockley, TX · P-5 Y, filed Jul 13, 2001 · 11 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNorthwest Energy Inc.
Production reportsnone
Latest permitNorthwest Energy, Inc.Sep 25, 1987
175
total depth, ft
1
permits on file
Sep 25, 1987
last permit issued
Dec 2, 1987
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 2, 1987
Shut in
—
Plugged
Jan 12, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
336504-99DrillNorthwest Energy, Inc.Sep 25, 1987Sep 25, 1987Oct 13, 1987175

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Caprock64

Perforations

Perforated and open-hole intervals.

FromToType
6684Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4656.259 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 19, 1988Jan 6, 1988Yes
00Jan 16, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20132094, documented in the API reference.