WELL · 42-201-32199 · DISTRICT 3

Taylor Heirs #101

Plugged

Harris County · Pierce Junction field  · Directional

Taylor Heirs #101 (API 42-201-32199) is a plugged well in Harris County, plugged January 9, 2019, last operated by Morgan Enterprises Inc..

The RRC has issued 3 drilling permits between 1990 and 2013, permitted to 8,500 ft.

Completion filings report 4 formation tops, including Discorbis, Het, Frio, Jackson.

Its 2 leases have reported 1.08M barrels of oil and 359K mcf of gas since January 1993, last reporting in July 2026. The leases carry 28 wells, so these are lease totals, not this well alone.

Operator of record

Morgan Enterprises Inc.

Houston, TX · P-5 Y, filed May 4, 2026 · 41 permits on file · (713) 222-7706

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMorgan Enterprises Inc.
Production reportsMorgan Enterprises, Inc.through Apr 2026
Latest permitMorgan Enterprises, Inc.Jan 14, 2013
8,500
total depth, ft
3
permits on file
Jan 14, 2013
last permit issued
Apr 25, 2013
completed
1.08M
cumulative oil, bbl
359K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 25, 2013
Shut in
—
Plugged
Jan 9, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 28 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Taylor Heirs O-3-24948Pierce JunctionMorgan Enterprises, Inc.15872K268KOct 2006 – Jul 2026
Taylor, E. R., Etal O-3-3363Pierce JunctionChevron U. S. A. Inc.13204K90.6KJan 1993 – Aug 2003

Oil, barrels lease total

Last 12 months 32,645 · prior 12 22,926(+42%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → May 2003
  2. 2Morgan Enterprises, Inc.Oct 2006 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
754060-99ReenterMorgan Enterprises, Inc.Jan 3, 2013Jan 14, 2013Jan 31, 20135,300
623628-99ReenterMorgan Enterprises, Inc.Aug 1, 2006Aug 4, 2006Aug 22, 20065,300
372330-99DrillChevron U. S. A. Inc.Apr 18, 1990Apr 20, 1990Sep 15, 19908,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-3363————
—— O-3-24948————

Formation tops

As filed on W-2/G-1. Subsea from 85 ft elevation.Download CSV →

FormationMD ftSubsea
Discorbis4,230-4,145
Discorbis4,246-4,161
Het4,500-4,415
FrioFRIO UNCONFORMITY4,575-4,490
JacksonJACKSON SHALE5,460-5,375

Perforations

Perforated and open-hole intervals.

FromToType
5,0565,068Perforated
5,1025,122Perforated
5,1185,124Perforated
5,1425,152Perforated
5,1925,220Perforated
5,2605,286Perforated
5,4385,504Perforated
5,4385,505Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,09614.751,233 S
10.52,09614.751,233 S
4.55,5536.125111 S
75,6789.8751,560 S
75,8379.8751,560 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 16, 2014May 3, 2013Yes
00Apr 30, 2007Oct 31, 2006—
00Feb 16, 2007——
00Jun 25, 1996May 7, 1996—
00Jan 29, 1996Jan 2, 1996—
00Feb 20, 1992Feb 6, 1992—
00Mar 14, 1991Jan 2, 1991Yes
00Feb 6, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20132199, documented in the API reference.