WELL · 42-201-32281 · DISTRICT 3

Seidel Otto #6B

Plugged

Harris County · Deckers Prairie S. (2150) field  · Vertical

Seidel Otto #6B (API 42-201-32281) is a plugged well in Harris County, plugged February 5, 1998, last operated by Mcday Energy Corp..

The RRC has issued 2 drilling permits between 1992 and 1993, permitted to 2,250 ft.

Completion filings report 4 formation tops, including 800 Miocene, 800' Miocene, 1400 Miocene, 1400' Miocene.

Operator of record

McDay Energy Corp.

Plano, TX · P-5 Y, filed Apr 4, 2026 · 52 permits on file · (214) 202-1064

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcDay Energy Corp.
Production reportsAmerican Energy Op. Corp.,thethrough May 1995
Latest permitMcDay Energy Corp.Oct 21, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,250
total depth, ft
2
permits on file
Oct 21, 1993
last permit issued
Jun 18, 1992
completed
0
cumulative oil, bbl
45.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 18, 1992
Shut in
—
Plugged
Feb 5, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Seidel, Otto G-3-147106Deckers Prairie, S. (Seg a 1800)American Energy Op. Corp.,the1035.5KSep 1993 – Feb 1998
Seidel, Otto G-3-142171Deckers Prairie, S. (2150)McDay Energy Corp.109.64KJan 1993 – Sep 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1McDay Energy Corp.Jan 1993 → Jul 1994
  2. 2Carnegie Financial Corp.Aug 1994 → Nov 1994
  3. 3American Energy Op. Corp.,theMar 1995 → May 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
417317-99RecompletionMcDay Energy Corp.Oct 21, 1993Oct 21, 1993Sep 8, 19931,960
399048-99DrillWBR, Inc.May 6, 1992May 6, 1992May 15, 19922,250

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-142171————
—— G-3-147106————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
800 Miocene830
800' Miocene830
1400 Miocene1,430
1400' Miocene1,430

Perforations

Perforated and open-hole intervals.

FromToType
1,8291,834Perforated
2,1802,182Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.55007.87591 S
2.3752,2484.75292 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 10, 1994Nov 1, 1993Yes
00Feb 9, 1994Oct 4, 1993—
00Nov 10, 1993——
00Oct 14, 1992Sep 2, 1992—
00Sep 24, 1992Jul 30, 1992Yes
00Sep 8, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20132281, documented in the API reference.