WELL · 42-201-32309 · DISTRICT 3

Josey L.M. B #5

Plugged

Harris County · Cypress (Y-6) field  · Vertical

Josey L.M. B #5 (API 42-201-32309) is a plugged well in Harris County, plugged October 8, 2021, last operated by Joy Resources Inc..

The RRC has issued 4 drilling permits between 1993 and 2005, permitted to 7,600 ft.

Completion filings report one formation top, including Yegua.

Its 5 leases have reported 49.4K barrels of oil and 696K mcf of gas since May 1993, last reporting in November 2024. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Joy Resources Inc.

Houston, TX · P-5 Y, filed Sep 4, 2025 · 52 permits on file · (979) 242-5941

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJoy Resources Inc.
Production reportsJoy Resources, Inc.through Feb 2019
Latest permitJoy Resources, Inc.Sep 14, 2005
7,600
total depth, ft
4
permits on file
Sep 14, 2005
last permit issued
—
completed
49.4K
cumulative oil, bbl
696K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1993 THROUGH Nov 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Oct 8, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Josey, L.M. "B" O-3-24768Cypress (Y-3)Joy Resources, Inc.131.8K52.2KSep 2005 – Nov 2024
Josey, L.M. B O-3-23914Cypress (Y-6)Joy Resources, Inc.11.99K4.88KNov 2000 – Apr 2009
Josey "B" O-3-24055Cypress (Y-4)Joy Resources, Inc.115.6K63.4KMar 2001 – Dec 2005
Josey, L. M. "B" G-3-161712Cypress (Y-6)Joy Resources, Inc.1078.4KJan 1997 – Jan 2001
Josey, L. M. "B" G-3-147762Cypress (Y-2)Josey, Lenoir M., Inc.10497KMay 1993 – May 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Josey, Lenoir M., Inc.Oct 1993 → Dec 1997
  2. 2Joy Resources, Inc.Jan 1998 → Feb 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
606196-99RecompletionJoy Resources, Inc.Sep 12, 2005Sep 14, 2005Sep 16, 20056,555
507384-99RecompletionJoy Resources, Inc.Apr 4, 2001Apr 6, 2001Mar 13, 20016,555
457118-99RecompletionJosey, Lenoir M., Inc.Jan 8, 1997Jan 16, 1997Jan 11, 19977,500
409905-99DrillJosey, Lenoir M., Inc.Mar 16, 1993Mar 24, 1993Apr 29, 19937,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-147762————
—— G-3-161712————
—— O-3-23914————
—— O-3-24055————
—— O-3-24768————

Formation tops

As filed on W-2/G-1. Subsea from 151 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua6,200-6,049

Perforations

Perforated and open-hole intervals.

FromToType
6,2546,258Perforated
6,3466,351Perforated
6,4886,490Perforated
6,5816,584Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,63312.25569 S
4.57,4927.875630 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 30, 2006Nov 2, 2005Yes
00Nov 16, 2005Jun 4, 2001Yes
00Oct 23, 2001Jun 4, 2001Yes
00Oct 9, 2001——
00Jan 30, 2001Nov 21, 2000—
00Dec 13, 2000——
00Mar 21, 1997Feb 10, 1997Yes
00Mar 3, 1997——
00Mar 14, 1994Feb 10, 1994—
00Feb 3, 1994Nov 9, 1993Yes
00Jan 28, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20132309, documented in the API reference.