WELL · 42-201-32377 · DISTRICT 3

EL Lago #1

Plugged

Harris County · Taylor Lake E. (Tex 2-III) field  · Directional

El Lago #1 (API 42-201-32377) is a plugged well in Harris County, plugged November 2, 2009, last operated by Legend Natural Gas II LP.

The RRC has issued 2 drilling permits (amended once) between 1994 and 1996, permitted to 12,764 ft.

It was permitted by Global Natural Resources Corp. and has since transferred to Legend Natural Gas II LP on the wellbore schedule.

Completion filings report 6 formation tops, including Anahuac, Frio, Anomalina, Tex 2 Ii.

Operator of record

Legend Natural Gas II LP

Permitted by Global Natural Resources Corp.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Sep 11, 2015 · 124 permits on file · (281) 644-5900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLegend Natural Gas II LP
Production reportsLegend Natural Gas II, LPthrough Mar 2009
Latest permitGlobal Natural Resources Corp.Jun 27, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,764
total depth, ft
3
permits on file
Jun 27, 1996
last permit issued
Jul 14, 1996
completed
0
cumulative oil, bbl
5.76M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1994 THROUGH Nov 2009

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 14, 1996
Shut in
—
Plugged
Nov 2, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
EL Lago G-3-151765Taylor Lake, E. (Tex 2-III)Legend Natural Gas II, LP105.76MSep 1994 – Nov 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Global Natural Resources Corp.Oct 1994 → May 1998
  2. 2Seagull Energy E&P Inc.Jun 1998 → Oct 2000
  3. 3Ocean Energy, Inc.Nov 2000 → Aug 2003
  4. 4Devon Louisiana CorporationSep 2003 → Apr 2005
  5. 5Legend Natural Gas II, LPMay 2005 → Mar 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
449740-99RecompletionGlobal Natural Resources Corp.Jun 26, 1996Jun 27, 1996Jul 12, 199612,764
425356-98DrillGlobal Natural Resources Corp.Nov 1, 1994Jul 13, 1994—12,139
425356-99DrillGlobal Natural Resources Corp.Jun 28, 1994Jul 13, 1994Jul 16, 199410,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-151765————

Formation tops

As filed on W-2/G-1. Subsea from 17 ft elevation.Download CSV →

FormationMD ftSubsea
Anahuac7,640-7,623
Frio9,100-9,083
Anomalina11,600-11,583
Anomalina11,660-11,643
Tex 2 II11,950-11,933
Tex 2-II11,950-11,933
Lox B12,370-12,353

Perforations

Perforated and open-hole intervals.

FromToType
11,98011,990Perforated
12,07612,090Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3754,60517.53,480 S
9.62512,19712.251,665 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 24, 1996Aug 6, 1996—
00Jun 28, 1996Apr 18, 1996—
00Jan 3, 1995Oct 25, 1994Yes
00Dec 1, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.