WELL · 42-201-32450 · DISTRICT 3
Clodine Gas Unit No. 3 #1
Harris County · Clodine North (Wilcox) field · Vertical
Clodine Gas Unit NO. 3 #1 (API 42-201-32450) is a plugged well in Harris County, plugged February 12, 2002, last operated by Anschutz Exploration Corporation.
The RRC has issued 2 drilling permits (amended once) between 1996 and 2000, permitted to 18,000 ft.
Completion filings report 4 formation tops, including Vicksburg, Jackson, Yegua, Wilcox.
Operator of record
Anschutz Exploration Corporation
Denver, CO · P-5 Y, filed Mar 4, 2016 · 56 permits on file · (888) 696-1300
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Anschutz Exploration Corporation |
| Production reports | Anschutz Exploration Corporationthrough May 2001 |
| Latest permit | Anschutz Exploration CorporationJun 13, 2000 |
- 18,000
- total depth, ft
- 3
- permits on file
- Jun 13, 2000
- last permit issued
- Mar 1, 1997
- completed
- 0
- cumulative oil, bbl
- 839K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1997 THROUGH Feb 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 1, 1997
- Shut in
- —
- Plugged
- Feb 12, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Clodine Gas Unit No. 3 G-3-178708 | Clodine, North (Cook Mtn. 8300) | Anschutz Exploration Corporation | 1 | 0 | 9.64K | Jul 2000 – Feb 2003 |
| Clodine Gas Unit No. 3 G-3-163607 | Clodine, North (Wilcox) | Anschutz Exploration Corporation | 1 | 0 | 830K | Mar 1997 – Jul 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Anschutz Exploration CorporationMar 1997 → May 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 495902-99 | Recompletion | Anschutz Exploration Corporation | Jun 7, 2000 | Jun 13, 2000 | Jul 14, 2000 | 11,030 |
| 449225-98 | Drill | Anschutz Exploration Corporation | Sep 26, 1996 | Jun 17, 1996 | Nov 19, 1996 | 18,000 |
| 449225-99 | Drill | Energy Development Corp. | Jun 12, 1996 | Jun 17, 1996 | — | 18,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-163607 | — | — | — | — |
| — | — G-3-178708 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 93 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,344 | 8,365 | Perforated |
| 11,210 | 11,226 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,750 | 17.5 | 3,214 S |
| 9.625 | 10,018 | 12.25 | 1,740 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 27, 2000 | Aug 30, 2000 | Yes |
| 00 | Oct 4, 2000 | — | — |
| 00 | Jul 28, 1997 | Jun 26, 1997 | Yes |
| 00 | Jul 25, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-32450 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-32450 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20132450, documented in the API reference.