WELL · 42-201-32517 · DISTRICT 3
Channelview Townsite #2
Harris County · Canadian Hunter (Yegua 10 630) field · Injection · Directional
Channelview Townsite #2 (API 42-201-32517) is a well in Harris County operated by Ballard Exploration Company Inc., completed June 17, 2024 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit (amended twice), issued November 5, 1997, permitted to 11,500 ft.
Completion filings report 4 formation tops, including Miocene (undifferentiated), Frio, Vicksburg, Yegua.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 199K barrels injected in the 12 months reported through December 2025.
Operator of record
Ballard Exploration Company Inc.
Houston, TX · P-5 Y, filed Dec 4, 2025 · 464 permits on file · (800) 992-8924
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ballard Exploration Company Inc. |
| Production reports | Ballard Exploration Company,inc.through Nov 2016 |
| Latest permit | Ballard Exploration Company,inc.Nov 5, 1997 |
- 11,500
- total depth, ft
- 3
- permits on file
- Nov 5, 1997
- last permit issued
- Jun 17, 2024
- completed
- 0
- cumulative oil, bbl
- 7.66M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 17, 2024
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Channelview Townsite G-3-168260 | Canadian Hunter (Yegua 10,630) | Ballard Exploration Company,inc. | 1 | 0 | 7.66M | Jan 1998 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ballard Exploration Company,inc.Jan 1998 → Nov 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 469681-97 | Drill | Ballard Exploration Company,inc. | Jun 3, 1998 | Nov 5, 1997 | — | 10,990 |
| 469681-98 | Drill | Ballard Exploration Company,inc. | Dec 19, 1997 | Nov 5, 1997 | — | 10,990 |
| 469681-99 | Drill | Ballard Exploration Company,inc. | Nov 5, 1997 | Nov 5, 1997 | Nov 5, 1997 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-168260 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 31 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,400 | 5,420 | Perforated |
| 5,597 | 5,612 | Perforated |
| 5,690 | 5,700 | Perforated |
| 6,010 | 6,020 | Perforated |
| 10,570 | 10,663 | Perforated |
| 10,986 | 11,078 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,075 | 17.5 | 2,065 S |
| 7 | 8,298 | 9.625 | 1,095 S |
| 9.625 | 8,550 | 12.25 | 810 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 4, 2024 | Jun 21, 2024 | — |
| 00 | Jun 19, 1998 | Feb 3, 1998 | Yes |
| 00 | Jun 8, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-32517 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-32517 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 199K
- bbl, last 12 reported months
- 199K
- bbl, all reported
- Dec 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000126613 | W-14 Disposal | Active | 15,000 | 1,850 | 3,700–5,800 |
MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS
Last 12 months 198,768
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20132517, documented in the API reference.