WELL · 42-201-32517 · DISTRICT 3

Channelview Townsite #2

Y

Harris County · Canadian Hunter (Yegua 10 630) field · Injection  · Directional

Channelview Townsite #2 (API 42-201-32517) is a well in Harris County operated by Ballard Exploration Company Inc., completed June 17, 2024 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued November 5, 1997, permitted to 11,500 ft.

Completion filings report 4 formation tops, including Miocene (undifferentiated), Frio, Vicksburg, Yegua.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 199K barrels injected in the 12 months reported through December 2025.

Operator of record

Ballard Exploration Company Inc.

Houston, TX · P-5 Y, filed Dec 4, 2025 · 464 permits on file · (800) 992-8924

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBallard Exploration Company Inc.
Production reportsBallard Exploration Company,inc.through Nov 2016
Latest permitBallard Exploration Company,inc.Nov 5, 1997
11,500
total depth, ft
3
permits on file
Nov 5, 1997
last permit issued
Jun 17, 2024
completed
0
cumulative oil, bbl
7.66M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 17, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Channelview Townsite G-3-168260Canadian Hunter (Yegua 10,630)Ballard Exploration Company,inc.107.66MJan 1998 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ballard Exploration Company,inc.Jan 1998 → Nov 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
469681-97DrillBallard Exploration Company,inc.Jun 3, 1998Nov 5, 1997—10,990
469681-98DrillBallard Exploration Company,inc.Dec 19, 1997Nov 5, 1997—10,990
469681-99DrillBallard Exploration Company,inc.Nov 5, 1997Nov 5, 1997Nov 5, 199711,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-168260————

Formation tops

As filed on W-2/G-1. Subsea from 31 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE3,400-3,369
Frio5,030-4,999
Vicksburg7,322-7,291
Vicksburg7,730-7,699
YeguaTOP YEGUA9,333-9,302
YeguaTOP YEGUA9,750-9,719
YeguaYEGUA EY10,083-10,052
YeguaYEGUA EY10,500-10,469

Perforations

Perforated and open-hole intervals.

FromToType
5,4005,420Perforated
5,5975,612Perforated
5,6905,700Perforated
6,0106,020Perforated
10,57010,663Perforated
10,98611,078Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3753,07517.52,065 S
78,2989.6251,095 S
9.6258,55012.25810 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 4, 2024Jun 21, 2024—
00Jun 19, 1998Feb 3, 1998Yes
00Jun 8, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

199K
bbl, last 12 reported months
199K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000126613W-14 DisposalActive15,0001,8503,700–5,800

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 198,768

010K20K30K2025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20132517, documented in the API reference.