WELL · 42-201-32550 · DISTRICT 3
Jesse Bishop Unit #1
Harris County · Directional · Sidetrack
Jesse Bishop Unit #1 (API 42-201-32550) is a permitted well in Harris County filed by Etoco Incorporated; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1998 and 2004, permitted to 9,400 ft.
Completion filings report 2 formation tops, including Vicksburg, Jackson.
Its 2 leases have reported 258K barrels of oil and 1.28M mcf of gas since March 1999, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Houston, TX · P-5 Y, filed Feb 4, 2005 · 70 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Etoco, L.P.through Apr 2026 |
| Latest permit | Etoco IncorporatedApr 14, 2004 |
- 9,400
- total depth, ft
- 3
- permits on file
- Apr 14, 2004
- last permit issued
- —
- completed
- 258K
- cumulative oil, bbl
- 1.28M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jesse Bishop Unit O-3-23966 | Sralla Road (Jackson, SW) | Etoco, L.P. | 1 | 258K | 423K | Mar 2001 – Jul 2026 |
| Bishop Unit G-3-175118 | Sralla Road (Jackson, SW) | Etoco Incorporated | 1 | 0 | 858K | Mar 1999 – May 2001 |
Oil, barrels lease total
Last 12 months 11,593 · prior 12 2,483(+367%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Etoco IncorporatedApr 1999 → May 2005
- 2Etoco, L.P.Jun 2005 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 543419-99 | Drill · sidetrack | Etoco Incorporated | Mar 18, 2004 | Apr 14, 2004 | Jul 15, 2004 | 9,400 |
| 514905-99 | Drill | Etoco Incorporated | Oct 31, 2001 | Nov 27, 2001 | — | 9,400 |
| 479375-99 | Drill | Etoco Incorporated | Sep 10, 1998 | Oct 7, 1998 | Feb 19, 1999 | 9,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-175118 | — | — | — | — |
| — | — O-3-23966 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 36 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,614 | 8,625 | Perforated |
| 8,712 | 8,724 | Perforated |
| 8,798 | 8,806 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,914 | 14.75 | 2,200 S |
| 7 | 8,461 | 9.875 | 395 S |
| 7 | 8,527 | 9.875 | 335 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 4, 2005 | Sep 16, 2004 | Yes |
| 00 | May 31, 2001 | Mar 22, 2001 | — |
| 00 | Apr 6, 2001 | — | — |
| 00 | Jan 21, 2000 | Apr 27, 1999 | Yes |
| 00 | Dec 23, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-32550 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-32550 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20132550, documented in the API reference.