WELL · 42-201-32571 · DISTRICT 3
Texas Northern Railway #6
Harris County · Greens Bayou (Frio 6450) field · Directional
Texas Northern Railway #6 (API 42-201-32571) is a plugged well in Harris County, plugged February 22, 2013, last operated by Thorp Petroleum Corporation.
The RRC has issued one drilling permit (amended once), issued May 20, 1999, permitted to 11,500 ft.
It was permitted by Cobra Operating Company and has since transferred to Thorp Petroleum Corporation on the wellbore schedule.
Operator of record
Permitted by Cobra Operating Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Mar 6, 2015 · 142 permits on file · (713) 962-8240
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Thorp Petroleum Corporation |
| Production reports | none |
| Latest permit | Cobra Operating CompanyMay 20, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,500
- total depth, ft
- 2
- permits on file
- May 20, 1999
- last permit issued
- Oct 30, 1999
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2000 THROUGH Feb 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 30, 1999
- Shut in
- —
- Plugged
- Feb 22, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Texas Northern Railway O-3-23824 | Greens Bayou (Frio 6450) | Thorp Petroleum Corporation | 1 | 0 | 0 | Jan 2000 – Feb 2014 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 484659-98 | Drill | Cobra Operating Company | Oct 26, 1999 | May 20, 1999 | May 21, 1999 | 11,500 |
| 484659-99 | Drill | Cobra Operating Company | May 20, 1999 | May 20, 1999 | — | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-23824 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,656 | 7,826 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,678 | 14.75 | 1,540 S |
| 7.625 | 7,802 | 9.875 | 640 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 26, 2000 | May 22, 2000 | — |
| 00 | May 22, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-32571 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-32571 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 936K
- bbl, all reported
- Sep 2012
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000089228 | H-1 Injection | Plugged Mar 12, 2013 | 1,000 | 3,000 | 5,999–7,205 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 1,400(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20132571, documented in the API reference.