WELL · 42-201-32617 · DISTRICT 3
Highlander Gas Unit 2 #2
Harris County · DE Zavala (Yegua 11330) field · Directional
Highlander Gas Unit 2 #2 (API 42-201-32617) is a plugged well in Harris County, plugged October 27, 2008, last operated by Sanchez Oil & Gas Corporation.
The RRC has issued 2 drilling permits (amended twice) between 2001 and 2003, permitted to 15,000 ft.
Completion filings report 3 formation tops, including Vicksburg, Jackson, Yegua.
Operator of record
Houston, TX · P-5 Y, filed Feb 4, 2026 · 541 permits on file · (956) 722-8092
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sanchez Oil & Gas Corporation |
| Production reports | Sanchez Oil & Gas Corporationthrough Dec 2006 |
| Latest permit | Sanchez Oil & Gas CorporationNov 25, 2003 |
- 15,000
- total depth, ft
- 4
- permits on file
- Nov 25, 2003
- last permit issued
- Jul 24, 2001
- completed
- 0
- cumulative oil, bbl
- 5.87M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2001 THROUGH Oct 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 24, 2001
- Shut in
- —
- Plugged
- Oct 27, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Highlander Gas Unit 2 G-3-184846 | DE Zavala (Yegua 11330) | Sanchez Oil & Gas Corporation | 1 | 0 | 3.9M | Jul 2001 – Oct 2008 |
| Highlander Gas Unit 2 G-3-202076 | DE Zavala (Yegua 11100) | Sanchez Oil & Gas Corporation | 1 | 0 | 1.98M | Dec 2003 – Oct 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sanchez Oil & Gas CorporationJul 2001 → Dec 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 539039-99 | Recompletion | Sanchez Oil & Gas Corporation | Nov 25, 2003 | Nov 25, 2003 | Nov 27, 2003 | 11,800 |
| 505539-97 | Drill | Sanchez Oil & Gas Corporation | Aug 1, 2003 | Feb 20, 2001 | — | 15,000 |
| 505539-98 | Drill | Sanchez Oil & Gas Corporation | Aug 27, 2001 | Feb 20, 2001 | — | 15,000 |
| 505539-99 | Drill | Sanchez Oil & Gas Corporation | Feb 20, 2001 | Feb 20, 2001 | Feb 28, 2001 | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-184846 | — | — | — | — |
| — | — G-3-202076 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 35 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,480 | 11,482 | Perforated |
| 11,724 | 11,726 | Perforated |
| 11,866 | 11,876 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 3,954 | 20 | 3,055 S |
| 11.875 | 8,705 | 14.75 | 1,560 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 26, 2004 | Jan 29, 2004 | Yes |
| 00 | Jul 13, 2004 | — | — |
| 00 | Nov 1, 2001 | Aug 27, 2001 | Yes |
| 00 | Oct 9, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-201-32617 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-201-32617 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20132617, documented in the API reference.