WELL · 42-201-32701 · DISTRICT 3

Destec #2D

Y

Harris County · Jacintoport (Yegua) field · Injection  · Vertical

Destec #2D (API 42-201-32701) is a well in Harris County operated by Etoco L.P., completed January 22, 2005 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 28, 2004, permitted to 7,200 ft.

It was permitted by Etoco Incorporated and has since transferred to Etoco L.P. on the wellbore schedule.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 135 barrels injected in the 12 months reported through December 2025.

Operator of record

Etoco L.P.

Permitted by Etoco Incorporated; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Feb 4, 2026 · 48 permits on file · (713) 805-3001

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEtoco L.P.
Production reportsnone
Latest permitEtoco IncorporatedSep 28, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,200
total depth, ft
1
permits on file
Sep 28, 2004
last permit issued
Jan 22, 2005
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 22, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Destec G-3-206262Jacintoport (Yegua)Etoco, L.P.100Jan 2005 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
551624-99DrillEtoco IncorporatedSep 28, 2004Sep 28, 2004Jan 2, 20057,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-206262————

Perforations

Perforated and open-hole intervals.

FromToType
6,8206,874Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,625115,690 S
8.57,1977.875760 S
5.57,1977.875760 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 16, 2006Feb 18, 2005Yes
00May 9, 2005Feb 1, 2005Yes
00Feb 17, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

135
bbl, last 12 reported months
2.34M
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000094805W-14 DisposalActive2,0003,2576,515–7,094

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 135 · prior 12 275(-51%)

05010015020242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20132701, documented in the API reference.