WELL · 42-201-32711 · DISTRICT 3

Tabb B #9

N

Harris County · Goose Creek field  · Vertical

Tabb B #9 (API 42-201-32711) is a well in Harris County operated by Gaither Petroleum Corporation, completed March 28, 2005.

The RRC has issued one drilling permit (amended once), issued January 26, 2005, permitted to 3,600 ft.

It was permitted by Erg Operating Company, Inc. and has since transferred to Gaither Petroleum Corporation on the wellbore schedule.

Its 2 leases have reported 284K barrels of oil and 42 mcf of gas since January 1993, last reporting in July 2026. The leases carry 16 wells, so these are lease totals, not this well alone.

Operator of record

Gaither Petroleum Corporation

Permitted by Erg Operating Company, Inc.; the EWA schedule now lists a different operator.

Katy, TX · P-5 Y, filed Nov 4, 2025 · 117 permits on file · (281) 830-7878

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGaither Petroleum Corporation
Production reportsGaither Petroleum Corporationthrough Apr 2026
Latest permitErg Operating Company, Inc.Jan 26, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,600
total depth, ft
2
permits on file
Jan 26, 2005
last permit issued
Mar 28, 2005
completed
284K
cumulative oil, bbl
42
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 28, 2005
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 16 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tabb "A" O-3-19711Goose CreekGaither Petroleum Corporation1243.1K21Jan 1993 – Jul 2026
Tabb "B" O-3-20069Goose CreekGaither Petroleum Corporation4241K21Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 2,809 · prior 12 2,444(+15%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pax Petroleum CorporationJan 1993 → May 1998
  2. 2Tabbs Bay Production CompanyJun 1998 → Jan 2001
  3. 3Energy Reserves Group, L.L.C.Feb 2001 → Oct 2001
  4. 4Erg Operating Company, Inc.Nov 2001 → Dec 2006
  5. 5Erg Resources, L.L.C.Jan 2007 → Sep 2011
  6. 6Linc Gulf Coast Petroleum, Inc.Oct 2011 → Aug 2016
  7. 7Torrent Oil LLCSep 2016 → Nov 2019
  8. 8Gaither Petroleum CorporationDec 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
556831-98DrillErg Operating Company, Inc.Feb 4, 2005Jan 26, 2005Feb 8, 20053,600
556831-99DrillErg Operating Company, Inc.Jan 26, 2005Jan 26, 2005—3,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-19711————
—— O-3-20069————

Perforations

Perforated and open-hole intervals.

FromToType
2,3862,392Perforated
2,4302,438Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,11411—
5.53,0647.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 24, 2021May 18, 2005Yes
00Aug 2, 2005May 18, 2005Yes
00May 25, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20132711, documented in the API reference.