WELL · 42-203-01126 · DISTRICT 6

Taylor W. B. H #21

Plugged

Harrison County · Waskom (Blossom) field  · Vertical

Taylor W. B. H #21 (API 42-203-01126) is a plugged well in Harrison County, plugged January 27, 2012, last operated by Jeems Bayou Production Corp..

The RRC has issued one drilling permit, issued December 13, 1994, permitted to 2,451 ft.

Completion filings report 2 formation tops, including Chalk, Lime.

Its 2 leases have reported 362K barrels of oil and 251K mcf of gas since January 1993, last reporting in July 2026. The leases carry 54 wells, so these are lease totals, not this well alone.

Operator of record

Jeems Bayou Production Corp.

Oil City, LA · P-5 Y, filed Sep 4, 2025 · 14 permits on file · (318) 464-4845

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJeems Bayou Production Corp.
Production reportsGreat Northern Energy, Incthrough May 2014
Latest permitJeems Bayou Production Corp.Dec 13, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,451
total depth, ft
1
permits on file
Dec 13, 1994
last permit issued
Dec 27, 1994
completed
362K
cumulative oil, bbl
251K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 27, 1994
Shut in
—
Plugged
Jan 27, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 54 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Taylor, W. B., -H- O-6-2854Longwood (Goodland Lime)Great Northern Energy, Inc53362K191KJan 1993 – Jul 2026
Taylor, W. B. "H" G-6-153277Waskom (Blossom)Jeems Bayou Production Corp.1059.7KDec 1994 – Jan 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jeems Bayou Production Corp.Jan 1993 → Jul 2012
  2. 2Great Northern Energy, IncAug 2012 → May 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427840-99RecompletionJeems Bayou Production Corp.Sep 8, 1994Dec 13, 1994Dec 19, 19942,451

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-153277————
—— O-6-2854————

Formation tops

As filed on W-2/G-1. Subsea from 299 ft elevation.Download CSV →

FormationMD ftSubsea
Chalk24653
Lime1,830-1,531

Perforations

Perforated and open-hole intervals.

FromToType
1,9341,936Perforated
2,3942,402Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625219—60 S
4.52,450—175 S
4.52,476—175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 14, 1995Jan 9, 1995Yes
00Mar 15, 1995——
00Feb 23, 1993Dec 17, 1992—
00Jan 12, 1984Jan 10, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

14K
bbl, last 12 reported months
29.1K
bbl, all reported
Mar 1992
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000005913H-1 InjectionPlugged Feb 3, 20121607002,394–2,402

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 13,960 · prior 12 14,789(-6%)

05001K1.5K19911992

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20301126, documented in the API reference.