WELL · 42-203-30204 · DISTRICT 6

George #2

N

Harrison County · Waskom (Cotton Valley) field  · Vertical

George #2 (API 42-203-30204) is a well in Harrison County operated by Rbd-Shelby Agency, completed May 16, 1977.

The RRC has issued one drilling permit (amended twice), issued October 19, 1992, permitted to 9,000 ft.

Completion filings report 6 formation tops, including Paluxy, Top Of Mooringsport, Top Of Mass. Anhydrite, Sligo.

Its 2 leases have reported 111K barrels of oil and 1.85M mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

RBD-Shelby Agency

Dallas, TX · P-5 Y, filed Jul 8, 1994 · 70 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRBD-Shelby Agency
Production reportsShelby Operating Companythrough Apr 2026
Latest permitRBD-Shelby AgencyOct 19, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
3
permits on file
Oct 19, 1992
last permit issued
May 16, 1977
completed
111K
cumulative oil, bbl
1.85M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 16, 1977
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
George, C.B. O-6-13234Waskom (Mattie)Shelby Operating Company1111K1.85MSep 1993 – Jul 2026
George G-6-71542Waskom (Cotton Valley)RBD-Shelby Agency100Jan 1993 – Sep 1993

Gas, mcf lease total

Last 12 months 34,966 · prior 12 33,068(+6%)

02K4K202420252026

Oil, barrels lease total

Last 12 months 2,511 · prior 12 2,558(-2%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1RBD-Shelby AgencySep 1993 → Dec 1993
  2. 2Shelby Operating CompanyJan 1994 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
404640-97RecompletionRBD-Shelby AgencyAug 27, 1993Oct 19, 1992Jul 22, 19936,300
404640-98RecompletionRBD-Shelby AgencyJul 16, 1993Oct 19, 1992—6,300
404640-99RecompletionRBD-Shelby AgencyOct 13, 1992Oct 19, 1992—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-71542————
—— O-6-13234————

Formation tops

As filed on W-2/G-1. Subsea from 250 ft elevation.Download CSV →

FormationMD ftSubsea
PaluxyTOP OF PALUXY2,636-2,386
Top of Mooringsport3,873-3,623
Top of Mass. Anhydrite4,517-4,267
SligoTOP OF SLIGO5,538-5,288
PettitTOP OF PETTIT5,653-5,403
Travis PeakTOP OF TRAVIS PEAK5,890-5,640

Perforations

Perforated and open-hole intervals.

FromToType
6,0586,078Perforated
6,0826,105Perforated
6,1226,150Perforated
9,2729,384Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,61912.251,040 S
2.8759,190——
5.59,6457.8751,235 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 16, 1994Sep 27, 1993Yes
00Nov 9, 1993——
00Jan 12, 1984Jun 6, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20330204, documented in the API reference.