WELL · 42-203-30273 · DISTRICT 6

Lou-Tex #3

N

Harrison County · Swanson Landing(travis Peak 6000 field  · Vertical

Lou-Tex #3 (API 42-203-30273) is a well in Harrison County operated by Jones Carl W. Operator, completed July 14, 1981.

The RRC has issued 3 drilling permits between 1981 and 1984, permitted to 6,550 ft.

Its lease has reported 13.9K barrels of oil and 162 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Jones Carl W. Operator

Shreveport, LA · P-5 Y, filed Mar 3, 2000 · 48 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJones Carl W. Operator
Production reportsWilcox Operating Corporationthrough Mar 2019
Latest permitJones, Carl W. OperatorDec 31, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,550
total depth, ft
3
permits on file
Dec 31, 1984
last permit issued
Jul 14, 1981
completed
13.9K
cumulative oil, bbl
162
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 14, 1981
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lou-Tex O-6-11609Longwood (Goodland Lime)Wilcox Operating Corporation313.9K162Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Allen Brothers CompanyJan 1993 → Apr 1997
  2. 2Quality Petroleum, Inc.May 1997 → Jul 1999
  3. 3Pace Royalty Trust Fund, Inc.Aug 1999 → Sep 2000
  4. 4Regal Petroleum ServicesDec 2000 → Aug 2001
  5. 5IpactJun 2003 → Jul 2007
  6. 6SDG Operating Company, IncApr 2009 → Dec 2009
  7. 7Big Cypress Consulting , LLCJan 2010 → Sep 2010
  8. 8Wilcox Operating CorporationOct 2010 → Mar 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
263098-99RecompletionJones, Carl W. OperatorDec 17, 1984Dec 31, 1984—4,850
154238-99RecompletionJones, Carl W. OperatorMar 23, 1982Mar 23, 1982—4,950
121477-99OtherJones, Carl W. OperatorJun 17, 1981Jun 17, 1981—6,550

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-11609————

Perforations

Perforated and open-hole intervals.

FromToType
2,3582,380Perforated
2,3602,372Perforated
4,9034,906Perforated
6,0006,010Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62553012.25—
2.3754,812——
2.3755,970——
4.56,2578.751,685 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 10, 2010Mar 31, 2010—
00Jan 15, 1993Nov 4, 1992—
00Feb 25, 1985Dec 13, 1984—
00Feb 20, 1985——
00Jan 12, 1984Dec 22, 1981—
00Jan 12, 1984Jul 30, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
235K
bbl, all reported
Feb 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000074172H-1 InjectionActive3,0001,1752,358–2,380

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20330273, documented in the API reference.