WELL · 42-203-30553 · DISTRICT 6
MNB #2
Harrison County · Waskom N (Travis Peak) field · Vertical
Mnb #2 (API 42-203-30553) is a plugged well in Harrison County, plugged November 9, 1990, last operated by Machin Art & Associates Inc..
The RRC has issued 2 drilling permits between 1978 and 1987, permitted to 6,500 ft.
It was permitted by Hinton Production Company and has since transferred to Machin Art & Associates Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including Austin Chalk, Glen Rose, Base Of Massive Anhyd, Rodessa.
Operator of record
Permitted by Hinton Production Company; the EWA schedule now lists a different operator.
Longview, TX · P-5 Y, filed Apr 2, 1994 · 113 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Machin Art & Associates Inc. |
| Production reports | none |
| Latest permit | Hinton Production CompanyDec 28, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,500
- total depth, ft
- 2
- permits on file
- Dec 28, 1987
- last permit issued
- Jan 11, 1988
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 11, 1988
- Shut in
- —
- Plugged
- Nov 9, 1990
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-6-126228 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 340605-99 | Recompletion | Hinton Production Company | Dec 23, 1987 | Dec 28, 1987 | — | 6,500 |
| 22438-99 | Drill | Hinton Production Company | Apr 19, 1978 | Apr 19, 1978 | Apr 24, 1978 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-126228 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 257 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin ChalkBASE OF AUSTIN CHALK | 2,420 | -2,163 |
| Glen Rose | 3,065 | -2,808 |
| Base of Massive Anhyd | 4,867 | -4,610 |
| Rodessa | 4,968 | -4,711 |
| Pettit | 5,680 | -5,423 |
| Travis Peak | 5,987 | -5,730 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,904 | 5,911 | Perforated |
| 6,102 | 6,105 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 465 | 12.25 | 245 S |
| 5 | 6,400 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 5, 1988 | Jan 14, 1988 | Yes |
| 00 | Feb 3, 1988 | — | — |
| 00 | Jan 12, 1984 | Nov 20, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-30553 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-30553 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20330553, documented in the API reference.