WELL · 42-203-30569 · DISTRICT 6

Letourneau GU 2 #2

Y

Harrison County · Oak Hill (Cotton Valley) field · Producing  · Vertical

Letourneau GU 2 #2 (API 42-203-30569) is a well in Harrison County operated by Tgnr East Texas LLC, completed January 23, 1979 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 31, 1978, permitted to 11,000 ft.

It was permitted by Tomlinson Interests, Inc. and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Austin Chalk, Paluxy, Base Ferry Lake, Sligo.

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas LLC

Permitted by Tomlinson Interests, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · 41 permits on file · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Nov 2024
Latest permitTomlinson Interests, Inc.May 31, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
1
permits on file
May 31, 1978
last permit issued
Jan 23, 1979
completed
0
cumulative oil, bbl
584K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 23, 1979
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Letourneau GU 2 G-6-81774Oak Hill (Cotton Valley)TGNR East Texas LLC10584KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 181(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyJan 1993 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Dec 2012
  4. 4Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  5. 5Cci East Texas Upstream LLCJul 2018 → Dec 2020
  6. 6TGNR East Texas LLCFeb 2021 → Nov 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
25504-99DrillTomlinson Interests, Inc.May 31, 1978May 31, 1978Jul 28, 197811,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-81774————

Formation tops

As filed on W-2/G-1. Subsea from 245 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkBASE AUSTIN3,015-2,770
PaluxyTOP PALUXY4,025-3,780
Base Ferry Lake6,025-5,780
SligoTOP SLIGO6,750-6,505
Top/LWR Cotton Valley Sd.10,070-9,825
BossierTOP BOSSIER SHALE10,400-10,155

Perforations

Perforated and open-hole intervals.

FromToType
10,11010,425Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,22212.251,025 S
9.6253,222—1,025 S
5.510,5128.751,430 S
5.510,512—1,430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 23, 2006Nov 15, 2005—
00Jan 12, 1984Feb 1, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20330569, documented in the API reference.