WELL · 42-203-30584 · DISTRICT 6
Panam Rudd #2
Harrison County · Vertical
Panam Rudd #2 (API 42-203-30584) is a permitted well in Harrison County filed by High Plains Operating, LLC; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1978 and 2016, permitted to 9,500 ft.
Completion filings report 6 formation tops, including Massive Anhydrite (marker), Rodessa, James Lime, Pettit.
Operator of record
Frisco, TX · P-5 Y, filed May 5, 2017 · 2 permits on file · (817) 526-4090
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Panamerican Operating Incthrough Jun 2014 |
| Latest permit | High Plains Operating, LLCAug 15, 2016 |
- 9,500
- total depth, ft
- 3
- permits on file
- Aug 15, 2016
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 253K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Panam Rudd G-6-83027 | Longwood (Cotton Valley) | Higher Standard Oil Company,inc. | 1 | 0 | 253K | Jan 1993 – Mar 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sonat Exploration Company -TylerJan 1993 → May 1995
- 2L-Texx Petroleum, LPJun 2003 → Dec 2004
- 3Evergreen Operating Co., Ltd.May 2010 → Feb 2014
- 4Panamerican Operating IncMar 2014 → Jun 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 817567-99 | Recompletion | High Plains Operating, LLC | Aug 8, 2016 | Aug 15, 2016 | — | 9,441 |
| 787595-99 | Recompletion | Panamerican Operating Inc | May 21, 2014 | Jul 2, 2014 | — | 9,441 |
| 30021-99 | Drill | McBee, Wm. D., Estate OF | Aug 7, 1978 | Aug 7, 1978 | Aug 29, 1978 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-83027 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 320 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE | 4,846 | -4,526 |
| Rodessa | 4,986 | -4,666 |
| James Lime | 5,306 | -4,986 |
| PettitPETTET | 5,566 | -5,246 |
| Travis Peak | 5,890 | -5,570 |
| Cotton Valley | 7,680 | -7,360 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,300 | 8,314 | Perforated |
| 9,034 | 9,366 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 12.75 | 60 | 20 | 8 S |
| 8.625 | 2,491 | 11 | 700 S |
| 2.375 | 8,028 | — | — |
| 5.5 | 9,493 | 7.875 | 1,460 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 12, 1986 | Apr 14, 1986 | — |
| 00 | Jan 12, 1984 | Feb 6, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-30584 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-30584 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20330584, documented in the API reference.