WELL · 42-203-30710 · DISTRICT 6
Batchelor A. P. G U I #1
Harrison County · Blocker (Cotton Valley) field · Vertical
Batchelor A. P. G U I #1 (API 42-203-30710) is a plugged well in Harrison County, plugged November 4, 1991, last operated by Smith Operating & Management CO..
The RRC has issued one drilling permit, issued December 17, 1979, permitted to 10,500 ft.
It was permitted by Exxon Corp. and has since transferred to Smith Operating & Management CO. on the wellbore schedule.
Operator of record
Smith Operating & Management Co.
Permitted by Exxon Corp.; the EWA schedule now lists a different operator.
Shreveport, LA · P-5 Y, filed May 6, 2005 · 6 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Operating & Management Co. |
| Production reports | none |
| Latest permit | Exxon Corp.Dec 17, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,500
- total depth, ft
- 1
- permits on file
- Dec 17, 1979
- last permit issued
- Apr 29, 1980
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 29, 1980
- Shut in
- —
- Plugged
- Nov 4, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-6-94289 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 67035-99 | Drill | Exxon Corp. | Dec 17, 1979 | Dec 17, 1979 | Jan 1, 1980 | 10,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-94289 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,169 | 10,337 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,221 | 12.25 | 1,075 S |
| 2.875 | 8,771 | — | — |
| 5.5 | 10,482 | 8.75 | 1,300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jun 22, 1981 | — |
| 00 | Jan 12, 1984 | Apr 16, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-30710 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-30710 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20330710, documented in the API reference.