WELL · 42-203-30761 · DISTRICT 6
Bosch J. M. #C1
Harrison County · Lansing North (Travis Peak) field · Vertical
Bosch J. M. #C1 (API 42-203-30761) is a plugged well in Harrison County, plugged September 20, 1993, last operated by Machin & Associates Inc..
The RRC has issued one drilling permit, issued July 8, 1980, permitted to 9,100 ft.
It was permitted by Machin, Art & Associates, Inc. and has since transferred to Machin & Associates Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Austin Chalk, Paluxy, Massive Anhydrite (marker), Pettit.
Operator of record
Permitted by Machin, Art & Associates, Inc.; the EWA schedule now lists a different operator.
Longview, TX · P-5 Y, filed Dec 4, 2025 · 78 permits on file · (903) 738-5181
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Machin & Associates Inc. |
| Production reports | Machin & Associates, Inc.through Feb 1993 |
| Latest permit | Machin, Art & Associates, Inc.Jul 8, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,100
- total depth, ft
- 1
- permits on file
- Jul 8, 1980
- last permit issued
- Oct 21, 1992
- completed
- 0
- cumulative oil, bbl
- 658
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 21, 1992
- Shut in
- —
- Plugged
- Sep 20, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bosch, J. M. G-6-91225 | Lansing, North (Travis Peak) | Machin & Associates, Inc. | 1 | 0 | 658 | Jan 1993 – Mar 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Machin & Associates, Inc.Jan 1993 → Feb 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 86003-99 | Drill | Machin, Art & Associates, Inc. | Jul 8, 1980 | Jul 8, 1980 | Aug 23, 1980 | 9,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-91225 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 227 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 3,367 | -3,140 |
| Paluxy | 4,500 | -4,273 |
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 6,148 | -5,921 |
| Pettit | 7,104 | -6,877 |
| Travis Peak | 7,320 | -7,093 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,290 | 8,355 | Perforated |
| 8,467 | 8,596 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,156 | 12.25 | 600 S |
| 2.375 | 7,539 | — | — |
| 4.5 | 9,020 | 7.875 | 1,400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 28, 1992 | Nov 12, 1992 | — |
| 00 | Jan 12, 1984 | Dec 30, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-30761 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-30761 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20330761, documented in the API reference.