WELL · 42-203-31085 · DISTRICT 6
Lynch David #1
Harrison County · Rosborough Spring E. (T. P.) field · Shut IN · Vertical
Lynch David #1 (API 42-203-31085) is a well in Harrison County operated by Brammer Engineering Inc., completed April 10, 1984 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued December 16, 1983, permitted to 10,150 ft.
It was permitted by Mcconathy Production CO., Inc. and has since transferred to Brammer Engineering Inc. on the wellbore schedule.
Completion filings report 11 formation tops, including Goodland, Paluxy, Glen Rose, Tma.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by McConathy Production Co., Inc.; the EWA schedule now lists a different operator.
Shreveport, LA · P-5 Y, filed Nov 4, 2025 · 194 permits on file · (800) 865-2708
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brammer Engineering Inc. |
| Production reports | Brammer Engineering, Inc.through Apr 2026 |
| Latest permit | McConathy Production Co., Inc.Dec 16, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,150
- total depth, ft
- 1
- permits on file
- Dec 16, 1983
- last permit issued
- Apr 10, 1984
- completed
- 0
- cumulative oil, bbl
- 1.65M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 10, 1984
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lynch, David G-6-110790 | Rosborough Spring, E. (Pet-Page) | Brammer Engineering, Inc. | 1 | 0 | 1.65M | Jan 1993 – Jul 2026 |
| Lynch, David O-6-11387 | Rosborough Spring, E. (T. P.) | Brammer Engineering, Inc. | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
Gas, mcf lease total
Last 12 months 12,051 · prior 12 11,523(+5%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brammer Engineering, Inc.Jan 1993 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 223868-99 | Drill | McConathy Production Co., Inc. | Apr 29, 1985 | Dec 16, 1983 | Jan 2, 1984 | 10,150 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-110790 | — | — | — | — |
| — | — O-6-11387 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 353 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| GoodlandGOODLAND LIME | 3,355 | -3,002 |
| Paluxy | 3,550 | -3,197 |
| Glen RoseGLENROSE | 3,870 | -3,517 |
| Tma | 5,290 | -4,937 |
| BMA | 5,558 | -5,205 |
| Sligo | 6,312 | -5,959 |
| Crane | 6,505 | -6,152 |
| Page | 6,540 | -6,187 |
| Travis Peak | 6,616 | -6,263 |
| Cotton ValleyTOP COTTON VALLEY | 8,350 | -7,997 |
| BossierBASE BOSSIER SHALE | 10,090 | -9,737 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,540 | 6,550 | Perforated |
| 6,540 | 6,552 | Perforated |
| 6,844 | 6,856 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,769 | 12.25 | 504 S |
| 7 | 10,150 | 8.75 | 1,070 S |
| 7 | 10,150 | 34 | 7,008 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 8, 1997 | Sep 6, 1996 | — |
| 00 | Jun 26, 1984 | May 18, 1984 | — |
| 00 | Jun 21, 1984 | May 18, 1984 | — |
| 00 | Jun 13, 1984 | May 18, 1984 | — |
| 00 | Jun 12, 1984 | May 18, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-31085 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-31085 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20331085, documented in the API reference.