WELL · 42-203-31123 · DISTRICT 6
McKay #B 1T
Harrison County · Vertical
Mckay #B 1T (API 42-203-31123) is a permitted well in Harrison County filed by Brammer Petroleum, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1984 and 1995, permitted to 6,800 ft.
Completion filings report 8 formation tops, including Blossom, Austin Chalk, Georgetown, Paluxy.
Operator of record
Gainesville, TX · P-5 Y, filed Nov 4, 2025 · 11 permits on file · (940) 736-1165
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Brammer Petroleum, Inc.through Sep 1994 |
| Latest permit | Brammer Petroleum, Inc.Dec 11, 1995 |
- 6,800
- total depth, ft
- 2
- permits on file
- Dec 11, 1995
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.76K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McKay G-6-110710 | McKay | Brammer Petroleum, Inc. | 1 | 0 | 1.76K | Jan 1993 – Dec 2022 |
| McKay G-6-111877 | Elysian (Travis Peak) | Brammer Petroleum, Inc. | 1 | 0 | 0 | Jan 1993 – Oct 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brammer Petroleum, Inc.Aug 1994 → Sep 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 442245-99 | Recompletion | Brammer Petroleum, Inc. | Dec 8, 1995 | Dec 11, 1995 | — | 6,797 |
| 234138-99 | Drill | Gibson Drlg. Co. | Jun 29, 1984 | Mar 30, 1984 | — | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-110710 | — | — | — | — |
| — | — G-6-111877 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 344 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BlossomTOP BLOSSOM | 2,210 | -1,866 |
| Austin ChalkBASE AUSTIN | 2,500 | -2,156 |
| GeorgetownTOP GEORGETOWN | 2,630 | -2,286 |
| PaluxyTOP PALUXY | 3,120 | -2,776 |
| Massive Anhydrite (marker)TOP MASSIVE ANHYDRITE | 4,900 | -4,556 |
| James LimeTOP JAMES LIME | 5,660 | -5,316 |
| PettitTOP PETTIT | 5,945 | -5,601 |
| Travis PeakTOP TRAVIS PEAK | 6,250 | -5,906 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,064 | 6,072 | Perforated |
| 6,464 | 6,472 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 613 | 11 | 235 sx |
| 4.5 | 6,797 | 7.875 | 675 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 30, 1986 | Sep 11, 1986 | — |
| 00 | Aug 22, 1984 | Jun 11, 1984 | — |
| 00 | Aug 21, 1984 | Jun 11, 1984 | — |
| 00 | Jun 8, 1984 | May 24, 1984 | — |
| 00 | Jun 7, 1984 | May 24, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-31123 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-31123 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20331123, documented in the API reference.