WELL · 42-203-31219 · DISTRICT 6
White Heirs #1
Harrison County · Carthage (Travis Peak Jip) field · Vertical
White Heirs #1 (API 42-203-31219) is a well in Harrison County operated by Cibola Oil & Gas Corp., completed March 15, 1985.
The RRC has issued one drilling permit, issued December 14, 1984, permitted to 6,800 ft.
Completion filings report 6 formation tops, including Massive Anhydrite (marker), B/Massive Anhydrite, Pettit, T/Pettit.
Its lease has reported 45.8K barrels of oil and 126 mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Tyler, TX · P-5 Y, filed Jan 13, 1987 · 42 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cibola Oil & Gas Corp. |
| Production reports | Richey Properties, Inc.through Apr 2026 |
| Latest permit | Cibola Oil & Gas Corp.Dec 14, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,800
- total depth, ft
- 1
- permits on file
- Dec 14, 1984
- last permit issued
- Mar 15, 1985
- completed
- 45.8K
- cumulative oil, bbl
- 126
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 15, 1985
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| White Heirs O-6-11798 | Carthage (Travis Peak Jip) | Richey Properties, Inc. | 1 | 45.8K | 126 | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 14 · prior 12 104(-87%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Eland Energy, Inc.Jan 1993 → Oct 1995
- 2Richey Properties, Inc.Nov 1995 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 261197-99 | Drill | Cibola Oil & Gas Corp. | Apr 30, 1985 | Dec 14, 1984 | Feb 10, 1985 | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-11798 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 268 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE | 5,254 | -4,986 |
| B/Massive Anhydrite | 5,254 | -4,986 |
| PettitTOP PETTIT | 6,048 | -5,780 |
| T/Pettit | 6,048 | -5,780 |
| Travis PeakTOP TRAVIS PEAK | 6,350 | -6,082 |
| T/Travis Peak | 6,350 | -6,082 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,430 | 6,468 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,011 | 11.875 | 467 S |
| 4.5 | 6,704 | 7.875 | 570 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 4, 1985 | Oct 30, 1985 | — |
| 00 | Nov 16, 1985 | — | — |
| 00 | May 20, 1985 | Apr 29, 1985 | — |
| 00 | May 17, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-31219 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-31219 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20331219, documented in the API reference.