WELL · 42-203-31446 · DISTRICT 6

Ware #1

Plugged

Harrison County · Shady Lane (Rodessa) field  · Vertical

Ware #1 (API 42-203-31446) is a plugged well in Harrison County, plugged February 23, 1990, last operated by Sonora Petroleum Corp..

The RRC has issued one drilling permit (amended once), issued June 5, 1986, permitted to 6,200 ft.

It was permitted by Justiss Oil Company, Inc. and has since transferred to Sonora Petroleum Corp. on the wellbore schedule.

Completion filings report 3 formation tops, including Tma, BMA, Rodessa.

Operator of record

Sonora Petroleum Corp.

Permitted by Justiss Oil Company, Inc.; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Sep 7, 2012 · 11 permits on file · (800) 872-3755

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSonora Petroleum Corp.
Production reportsnone
Latest permitJustiss Oil Company, Inc.Jun 5, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,200
total depth, ft
2
permits on file
Jun 5, 1986
last permit issued
Jul 29, 1986
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 29, 1986
Shut in
—
Plugged
Feb 23, 1990

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
— G-6-122829——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
302957-98DrillJustiss Oil Company, Inc.Nov 24, 1986Jun 5, 1986—6,200
302957-99DrillJustiss Oil Company, Inc.Jun 2, 1986Jun 5, 1986Jul 18, 19866,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-122829————

Formation tops

As filed on W-2/G-1. Subsea from 363 ft elevation.Download CSV →

FormationMD ftSubsea
Tma5,352-4,989
BMA5,611-5,248
Rodessa5,956-5,593

Perforations

Perforated and open-hole intervals.

FromToType
5,9575,960Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62560612.25330 S
4.56,0427.875225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 9, 1987Nov 18, 1986Yes
00Dec 30, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20331446, documented in the API reference.