WELL · 42-203-31823 · DISTRICT 6
McJimsey #4
Harrison County · Vertical
Mcjimsey #4 (API 42-203-31823) is a permitted well in Harrison County filed by Barrow-Shaver Resources CO.; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended twice) between 1989 and 2008, permitted to 8,400 ft.
Completion filings report 4 formation tops, including BMA, James Lime, Pettit, Travis Peak.
Operator of record
Tyler, TX · P-5 Y, filed Feb 4, 2026 · 201 permits on file · (903) 593-5221
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Barrow-Shaver Resources Co.through Sep 2014 |
| Latest permit | Barrow-Shaver Resources Co.May 7, 2008 |
- 8,400
- total depth, ft
- 4
- permits on file
- May 7, 2008
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 124K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McJimsey G-6-134441 | Carthage (Page) | Barrow-Shaver Resources Co. | 1 | 0 | 124K | Jan 1993 – May 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Petroleum Production Mgmt., Inc.Jan 1993 → Oct 1994
- 2Barrow-Shaver Resources Co.Oct 2008 → Sep 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 659231-99 | Recompletion | Barrow-Shaver Resources Co. | Apr 9, 2008 | May 7, 2008 | — | 7,000 |
| 363870-97 | Drill | Petroleum Production Mgmt., Inc. | Apr 13, 1990 | Sep 13, 1989 | — | 8,400 |
| 363870-98 | Drill | Petroleum Production Mgmt., Inc. | Sep 18, 1989 | Sep 13, 1989 | Oct 4, 1989 | 8,400 |
| 363870-99 | Drill | Petroleum Production Mgmt., Inc. | Sep 13, 1989 | Sep 13, 1989 | — | 8,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-134441 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 281 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 5,140 | -4,859 |
| James LimeJAMES | 5,655 | -5,374 |
| Pettit | 5,949 | -5,668 |
| Travis Peak | 6,272 | -5,991 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,188 | 6,192 | Perforated |
| 6,552 | 6,561 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 300 | 12.25 | 1,214 S |
| 8.625 | 685 | 12.25 | 200 S |
| 5.5 | 8,131 | 7.875 | 1,065 S |
| 5.5 | 8,203 | 7.875 | 1,065 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 19, 2009 | May 6, 2009 | — |
| 00 | Jul 13, 1990 | May 11, 1990 | Yes |
| 00 | Jun 6, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-31823 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-31823 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20331823, documented in the API reference.