WELL · 42-203-31867 · DISTRICT 6

Neal George #2 #2

Y

Harrison County · Blocker (Richardson Sand) field · Shut IN  · Vertical

Neal George #2 #2 (API 42-203-31867) is a well in Harrison County operated by Enpower Resources Inc., completed February 17, 1990 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued January 5, 1990, permitted to 7,000 ft.

It was permitted by Petroleum Production Mgmt., Inc. and has since transferred to Enpower Resources Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including BMA, James Lime, Pettit, Travis Peak.

Its lease has reported 53.7K barrels of oil and 325K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Enpower Resources Inc.

Permitted by Petroleum Production Mgmt., Inc.; the EWA schedule now lists a different operator.

Sugar Land, TX · P-5 Y, filed Jul 4, 2026 · (281) 306-0611

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnpower Resources Inc.
Production reportsEast Texas Exploration, LLCthrough Aug 2014
Latest permitPetroleum Production Mgmt., Inc.Jan 5, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
2
permits on file
Jan 5, 1990
last permit issued
Feb 17, 1990
completed
53.7K
cumulative oil, bbl
325K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 17, 1990
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Neal, George #2 O-6-12679Blocker (Richardson Sand)Enpower Resources Inc.153.7K325KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Petroleum Production Mgmt., Inc.Jan 1993 → Nov 1997
  2. 2GMX Resources Inc.Dec 1997 → Aug 2012
  3. 3East Texas Exploration, LLCSep 2012 → Mar 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
368278-98DrillPetroleum Production Mgmt., Inc.Mar 23, 1990Jan 5, 1990—7,000
368278-99DrillPetroleum Production Mgmt., Inc.Jan 5, 1990Jan 5, 1990—7,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-12679————

Formation tops

As filed on W-2/G-1. Subsea from 313 ft elevation.Download CSV →

FormationMD ftSubsea
BMA5,374-5,061
James LimeJAMES5,863-5,550
Pettit6,140-5,827
Travis Peak6,451-6,138

Perforations

Perforated and open-hole intervals.

FromToType
6,4836,498Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62564612.25372 S
5.56,9057.875340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 15, 1990Mar 29, 1990Yes
00May 11, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000127008H-1 InjectionNot activated5,0002,7456,210–7,000

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20331867, documented in the API reference.