WELL · 42-203-32100 · DISTRICT 6

Lewis Gas Unit "B" #4

N

Harrison County  · Vertical

Lewis Gas Unit "B" #4 (API 42-203-32100) is a permitted well in Harrison County filed by Amoco Production Company; no completion report is on file yet.

The RRC has issued 2 drilling permits (amended 3 times) between 1992 and 2001, permitted to 11,000 ft.

Completion filings report 6 formation tops, including Massive Anhydrite (marker), Rodessa, Pettit, Travis Peak.

Operator of record

Amoco Production Company

Houston, TX · P-5 Y, filed May 7, 2004 · 7,201 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsBP America Production Companythrough Aug 2007
Latest permitAmoco Production CompanyJul 9, 2001
11,000
total depth, ft
5
permits on file
Jul 9, 2001
last permit issued
—
completed
0
cumulative oil, bbl
1.93M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lewis Gas Unit -B- G-6-144712Woodlawn (Cotton Valley)Merit Energy Company101.09MFeb 1993 – Jul 2026
Lewis Gas Unit -B- G-6-147053Woodlawn (Travis Peak)Merit Energy Company10846KOct 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyFeb 1993 → Dec 2001
  2. 2BP America Production CompanyJan 2002 → Aug 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
510896-98RecompletionAmoco Production CompanySep 27, 2001Jul 9, 2001—6,620
510896-99RecompletionAmoco Production CompanyJun 29, 2001Jul 9, 2001—10,110
396775-97DrillAmoco Production CompanyDec 23, 1992Feb 26, 1992May 20, 199210,130
396775-98DrillAmoco Production CompanyMar 26, 1992Feb 26, 1992—11,000
396775-99DrillAmoco Production CompanyFeb 18, 1992Feb 26, 1992—11,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-144712————
—— G-6-147053————

Formation tops

As filed on W-2/G-1. Subsea from 297 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)MASSIVE ANHYDRITE5,290-4,993
Rodessa5,674-5,377
Pettit6,338-6,041
Travis Peak6,574-6,277
Cotton Valley8,608-8,311
BossierBOSSIER SHALE9,950-9,653

Perforations

Perforated and open-hole intervals.

FromToType
6,7806,790Perforated
6,7906,800Perforated
6,9206,928Perforated
8,5128,532Perforated
8,5358,550Perforated
8,5608,690Perforated
8,6088,623Perforated
8,6288,638Perforated
9,6069,614Perforated
9,6769,684Perforated
9,6869,696Perforated
9,7049,716Perforated
9,7209,726Perforated
9,7429,750Perforated
9,7849,794Perforated
9,8079,813Perforated
9,8189,824Perforated
9,9189,933Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,11814.75725 S
2.8757,1569.8751,750 S
4.510,0957.875650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 11, 1995Mar 21, 1995—
00Dec 9, 1993Oct 21, 1993Yes
00Nov 5, 1993——
00Apr 30, 1993Mar 8, 1993Yes
00Apr 9, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20332100, documented in the API reference.