WELL · 42-203-32142 · DISTRICT 6

Davis Frank A-3 #1C

Y

Harrison County · Woodlawn (Rodessa) field · Shut IN-Multi-Compl  · Vertical

Davis Frank A-3 #1C (API 42-203-32142) is a well in Harrison County operated by Tipco Operating CO., completed June 3, 1993 and listed as shut in-multi-compl on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 1992 and 1993, permitted to 6,800 ft.

Completion filings report 4 formation tops, including Rodessa, Pettit, Tp Transition, Tp.

No lease production has been reported under this well’s leases.

Operator of record

Tipco Operating Co.

Marshall, TX · P-5 Y, filed Aug 4, 2025 · 13 permits on file · (318) 458-3339

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTipco Operating Co.
Production reportsTipco Operating Co.through Jun 2012
Latest permitTipco Operating Co.Jun 17, 1993
6,800
total depth, ft
3
permits on file
Jun 17, 1993
last permit issued
Jun 3, 1993
completed
0
cumulative oil, bbl
1.28M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 3, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis, Frank A-3 G-6-143431Woodlawn (Travis Peak)Tipco Operating Co.10939KJan 1993 – Jul 2026
Davis, Frank A-3 G-6-145979Woodlawn (Rodessa)Tipco Operating Co.10344KJun 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Tipco Operating Co.Jan 1993 → Jun 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
412957-99OtherTipco Operating Co.Jun 17, 1993Jun 17, 1993Jun 2, 19936,800
400807-98DrillTipco Operating Co.Dec 8, 1992Jul 6, 1992—6,800
400807-99DrillTipco Operating Co.Jul 2, 1992Jul 6, 1992Jul 21, 19926,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-143431————
—— G-6-145979————

Formation tops

As filed on W-2/G-1. Subsea from 256 ft elevation.Download CSV →

FormationMD ftSubsea
RodessaRODESSA HILL5,716-5,460
RodessaRODESSA HILL5,718-5,462
PettitPETTET6,450-6,194
Pettit6,450-6,194
TP Transition6,620-6,364
TP6,720-6,464

Perforations

Perforated and open-hole intervals.

FromToType
5,7185,741Perforated
6,6366,646Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62563010.75125 S
5.56,7877.875445 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 11, 1993Jun 25, 1993Yes
00Aug 3, 1993——
00Jan 19, 1993Dec 3, 1992Yes
00Jan 8, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20332142, documented in the API reference.