WELL · 42-203-32142 · DISTRICT 6
Davis Frank A-3 #1C
Harrison County · Woodlawn (Rodessa) field · Shut IN-Multi-Compl · Vertical
Davis Frank A-3 #1C (API 42-203-32142) is a well in Harrison County operated by Tipco Operating CO., completed June 3, 1993 and listed as shut in-multi-compl on the RRC schedule.
The RRC has issued 2 drilling permits (amended once) between 1992 and 1993, permitted to 6,800 ft.
Completion filings report 4 formation tops, including Rodessa, Pettit, Tp Transition, Tp.
No lease production has been reported under this well’s leases.
Operator of record
Marshall, TX · P-5 Y, filed Aug 4, 2025 · 13 permits on file · (318) 458-3339
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tipco Operating Co. |
| Production reports | Tipco Operating Co.through Jun 2012 |
| Latest permit | Tipco Operating Co.Jun 17, 1993 |
- 6,800
- total depth, ft
- 3
- permits on file
- Jun 17, 1993
- last permit issued
- Jun 3, 1993
- completed
- 0
- cumulative oil, bbl
- 1.28M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 3, 1993
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Davis, Frank A-3 G-6-143431 | Woodlawn (Travis Peak) | Tipco Operating Co. | 1 | 0 | 939K | Jan 1993 – Jul 2026 |
| Davis, Frank A-3 G-6-145979 | Woodlawn (Rodessa) | Tipco Operating Co. | 1 | 0 | 344K | Jun 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tipco Operating Co.Jan 1993 → Jun 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 412957-99 | Other | Tipco Operating Co. | Jun 17, 1993 | Jun 17, 1993 | Jun 2, 1993 | 6,800 |
| 400807-98 | Drill | Tipco Operating Co. | Dec 8, 1992 | Jul 6, 1992 | — | 6,800 |
| 400807-99 | Drill | Tipco Operating Co. | Jul 2, 1992 | Jul 6, 1992 | Jul 21, 1992 | 6,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-143431 | — | — | — | — |
| — | — G-6-145979 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 256 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,718 | 5,741 | Perforated |
| 6,636 | 6,646 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 630 | 10.75 | 125 S |
| 5.5 | 6,787 | 7.875 | 445 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 11, 1993 | Jun 25, 1993 | Yes |
| 00 | Aug 3, 1993 | — | — |
| 00 | Jan 19, 1993 | Dec 3, 1992 | Yes |
| 00 | Jan 8, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-32142 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-32142 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20332142, documented in the API reference.