WELL · 42-203-32244 · DISTRICT 6
Scott, T.P. #9
Harrison County · Vertical
Scott, T.P. #9 (API 42-203-32244) is a permitted well in Harrison County filed by Seagull Mid-South, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits (amended once) between 1991 and 1994, permitted to 9,750 ft.
Completion filings report 5 formation tops, including Glen Rose, B/Massive Anhydrite, Massive Anyhrite, Sligo.
Its lease has reported 81.3K barrels of oil and 345K mcf of gas since March 1994, last reporting in March 2020.
Operator of record
Houston, TX · P-5 Y, filed Oct 2, 1998 · 142 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Ocean Energy, Inc.through Mar 2002 |
| Latest permit | Seagull Mid-South, Inc.Jan 3, 1994 |
- 9,750
- total depth, ft
- 3
- permits on file
- Jan 3, 1994
- last permit issued
- —
- completed
- 81.3K
- cumulative oil, bbl
- 345K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH Mar 2020
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Scott, T.P. O-6-13286 | Jonesville (Travis Peak 5940) | Sheridan Production Co III, LLC | 1 | 81.3K | 345K | Mar 1994 – Mar 2020 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seagull Mid-South, Inc.Mar 1994 → May 1998
- 2Seagull Energy E&P Inc.Jun 1998 → Oct 2000
- 3Ocean Energy, Inc.Nov 2000 → Sep 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 419815-98 | Drill | Seagull Mid-South, Inc. | Mar 14, 1994 | Jan 3, 1994 | — | 6,800 |
| 419815-99 | Drill | Seagull Mid-South, Inc. | Dec 31, 1993 | Jan 3, 1994 | Jan 18, 1994 | 7,200 |
| 395116-99 | Drill | Arkla Exploration Co. | Dec 16, 1991 | Dec 23, 1991 | — | 9,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-13286 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 237 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glen Rose | 2,978 | -2,741 |
| B/Massive Anhydrite | 4,736 | -4,499 |
| Massive Anyhrite | 5,238 | -5,001 |
| Sligo | 5,534 | -5,297 |
| Travis Peak | 5,866 | -5,629 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,888 | 5,896 | Perforated |
| 5,904 | 5,912 | Perforated |
| 5,932 | 5,938 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 810 | 12.25 | 325 S |
| 4.5 | 6,800 | 7.875 | 975 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 8, 1994 | Apr 6, 1994 | Yes |
| 00 | May 20, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-32244 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-32244 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.