WELL · 42-203-32461 · DISTRICT 6

Abercrombie #4

N

Harrison County · Waskom (Travis Peak 7) field  · Vertical

Abercrombie #4 (API 42-203-32461) is a well in Harrison County operated by Shelby Operating Company, completed November 4, 1997.

The RRC has issued 3 drilling permits (amended once) between 1997 and 1998, permitted to 6,450 ft.

Completion filings report 9 formation tops, including Nacatoch, Nacotoch, Fredricksburg, Paluxy.

Its 3 leases have reported 95.7K barrels of oil and 528K mcf of gas since November 1997, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Shelby Operating Company

Dallas, TX · P-5 Y, filed Dec 4, 2025 · 86 permits on file · (214) 739-5384

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleShelby Operating Company
Production reportsShelby Operating Companythrough Apr 2026
Latest permitShelby Operating CompanyJul 8, 1998
6,450
total depth, ft
4
permits on file
Jul 8, 1998
last permit issued
Nov 4, 1997
completed
95.7K
cumulative oil, bbl
528K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 4, 1997
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Abercrombie O-6-13871Waskom (Mattie)Shelby Operating Company195.7K438KNov 1998 – Jul 2026
Abercrombie G-6-165928Waskom (Travis Peak 7)Shelby Operating Company1023.5KNov 1997 – Apr 1999
Abercrombie G-6-166420Waskom (Paluxy, Lower)Shelby Operating Company1065.6KNov 1997 – Apr 1999

Oil, barrels lease total

Last 12 months 738 · prior 12 1,018(-28%)

050100150202420252026

Gas, mcf lease total

Last 12 months 4,687 · prior 12 5,185(-10%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shelby Operating CompanyNov 1997 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
477755-98RecompletionShelby Operating CompanyNov 19, 1998Jul 8, 1998Aug 31, 19976,220
477755-99RecompletionShelby Operating CompanyJul 7, 1998Jul 8, 1998—6,220
470360-99RecompletionShelby Operating CompanyNov 21, 1997Nov 25, 1997Nov 26, 19973,300
466120-99DrillShelby Operating CompanyAug 11, 1997Aug 13, 1997Aug 30, 19976,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-165928————
—— G-6-166420————
—— O-6-13871————

Formation tops

As filed on W-2/G-1. Subsea from 291 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch990-699
Nacotoch990-699
Fredricksburg2,375-2,084
Paluxy2,550-2,259
Anhyd.4,500-4,209
Anhydrite4,500-4,209
Rodessa4,805-4,514
Pettit5,630-5,339
Travis Peak5,900-5,609

Perforations

Perforated and open-hole intervals.

FromToType
3,1993,206Perforated
5,9165,926Perforated
5,9825,993Perforated
6,2446,312Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62543011175 S
5.56,4507.8751,480 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 10, 1999Nov 30, 1998Yes
00Jan 20, 1999——
00Feb 18, 1998Dec 15, 1997Yes
00Feb 10, 1998——
00Jan 22, 1998Nov 21, 1997Yes
00Jan 15, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20332461, documented in the API reference.