WELL · 42-203-32686 · DISTRICT 6

Narramore #5

Y

Harrison County · Waskom (Cotton Valley) field · Producing  · Vertical

Narramore #5 (API 42-203-32686) is a well in Harrison County operated by Brookston Energy Inc., completed October 14, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 11, 2001, permitted to 9,700 ft.

It was permitted by Winchester Production Company and has since transferred to Brookston Energy Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Mooringsport, Massive Anhydrite (marker), Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Brookston Energy Inc.

Permitted by Winchester Production Company; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Jun 4, 2026 · 46 permits on file · (903) 312-8885

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBrookston Energy Inc.
Production reportsBrookston Energy, Inc.through Apr 2026
Latest permitWinchester Production CompanyJun 11, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,700
total depth, ft
1
permits on file
Jun 11, 2001
last permit issued
Oct 14, 2010
completed
0
cumulative oil, bbl
1.07M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 14, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Narramore G-6-185654Waskom (Cotton Valley)Brookston Energy, Inc.101.07MOct 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 13,743 · prior 12 17,949(-23%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Winchester Production CompanyOct 2001 → Apr 2007
  2. 2Winchester Production Co., Ltd.May 2007 → Jun 2008
  3. 3Exco Production Company, LPJul 2008 → Dec 2009
  4. 4Exco Operating Company, LPJan 2010 → Feb 2011
  5. 5Compass Energy Operating, LLCApr 2015 → Nov 2015
  6. 6Indigo Resources LLCDec 2015 → Oct 2018
  7. 7Brookston Energy, Inc.Nov 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
509896-99DrillWinchester Production CompanyJun 6, 2001Jun 11, 2001Jul 29, 20019,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-185654————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Mooringsport3,902
Massive Anhydrite (marker)MASSIVE ANHYDRITE4,603
PettitPETTET5,671
Pettit5,671
Travis Peak5,972
Bossier9,532
BossierBOSSIER SHALE9,532
James LimeJAMES—

Perforations

Perforated and open-hole intervals.

FromToType
9,3409,578Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,10012.25545 S
4.59,8007.8752,980 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 22, 2011May 13, 2011—
00Dec 6, 2001Oct 26, 2001Yes
00Nov 29, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20332686, documented in the API reference.