WELL · 42-203-32788 · DISTRICT 6
Durkee Gas Unit #1 #6
Harrison County · Vertical
Durkee Gas Unit #1 #6 (API 42-203-32788) is a permitted well in Harrison County filed by T W Clemons Operating CO., LLC; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2003 and 2026, permitted to 10,100 ft.
Completion filings report 3 formation tops, including Pettit, Travis Peak, Cotton Valley.
Operator of record
T W Clemons Operating Co., LLC
Minden, LA · P-5 Y, filed Oct 4, 2025 · 8 permits on file · (318) 455-3075
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | T W Clemons Operating Co., LLCthrough Apr 2026 |
| Latest permit | T W Clemons Operating Co., LLCMay 20, 2026 |
- 10,100
- total depth, ft
- 2
- permits on file
- May 20, 2026
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 845K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Durkee Gas Unit #1 G-6-196713 | Woodlawn (Cotton Valley) | T W Clemons Operating Co., LLC | 1 | 0 | 845K | May 2003 – Jul 2026 |
Gas, mcf lease total
Last 12 months 1,848 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Newfield Exploration CompanyJun 2003 → Aug 2011
- 2Ironwood Oil & Gas LLCSep 2011 → Jun 2014
- 3Cl&f Operating LLCJul 2014 → Nov 2016
- 4Clemons, Tony W.Dec 2016 → Dec 2016
- 5T W Clemons Operating Co., LLCJan 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 915399-99 | Recompletion | T W Clemons Operating Co., LLC | May 4, 2026 | May 20, 2026 | — | 10,025 |
| 530186-99 | Drill | Eex E&P Company, L.P. | Apr 1, 2003 | Apr 1, 2003 | Apr 14, 2003 | 10,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-196713 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 300 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pettit | 6,347 | -6,047 |
| Travis Peak | 6,710 | -6,410 |
| Cotton Valley | 8,550 | -8,250 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,422 | 6,534 | Perforated |
| 8,470 | 8,806 | Perforated |
| 8,924 | 9,130 | Perforated |
| 9,310 | 9,364 | Perforated |
| 9,582 | 9,942 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,510 | 11 | 471 S |
| 5.5 | 10,025 | 8.75 | 728 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 3, 2026 | Jun 15, 2026 | — |
| 00 | Oct 6, 2003 | Aug 26, 2003 | Yes |
| 00 | Sep 24, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-32788 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-32788 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20332788, documented in the API reference.