WELL · 42-203-34971 · DISTRICT 6
Foreman Gas Unit #3H
Harrison County · Carthage North (Cotton Valley) field · Producing · Horizontal
Foreman Gas Unit #3H (API 42-203-34971) is a horizontal well in Harrison County operated by Brookston Energy Inc., completed February 29, 2012 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued July 16, 2010, permitted to 14,000 ft.
It was permitted by Penn Virginia Oil & Gas, L.P. and has since transferred to Brookston Energy Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including James Lime, Travis Peak, Cotton Valley.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Penn Virginia Oil & Gas, L.P.; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Jun 4, 2026 · 46 permits on file · (903) 312-8885
SOURCE · RRC EWA WELLBORE SCHEDULE
- 14,000
- total depth, ft
- 1
- permits on file
- Jul 16, 2010
- last permit issued
- Feb 29, 2012
- completed
- 0
- cumulative oil, bbl
- 1.59M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 29, 2012
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Foreman Gas Unit G-6-260935 | Carthage, North (Cotton Valley) | Brookston Energy, Inc. | 1 | 0 | 1.59M | Oct 2010 – Jul 2026 |
Gas, mcf lease total
Last 12 months 5,145 · prior 12 4,006(+28%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Penn Virginia Oil & Gas, L.P.Oct 2010 → Sep 2015
- 2Covey Park Operating LLCOct 2015 → Apr 2016
- 3Covey Park Resources LLCMay 2016 → Aug 2019
- 4Comstock Oil & Gas, LLCSep 2019 → Aug 2025
- 5Brookston Energy, Inc.Oct 2025 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 696741-99 | Drill | Penn Virginia Oil & Gas, L.P. | May 28, 2010 | Jul 16, 2010 | Aug 26, 2010 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-260935 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 326 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James Lime | 5,841 | -5,515 |
| Travis Peak | 6,448 | -6,122 |
| Cotton ValleyCOTTON VALLEY DAVIS B | 9,663 | -9,337 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,950 | 12,427 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,541 | 14.75 | 905 S |
| 7.625 | 8,805 | 9.875 | 655 S |
| 4.5 | 12,705 | 6.75 | 495 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 30, 2012 | Mar 14, 2012 | — |
| 00 | Sep 30, 2011 | Nov 22, 2010 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-203-34971 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-203-34971 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20334971, documented in the API reference.