WELL · 42-203-35223 · DISTRICT 6

John. T. Favell et AL #1

Y

Harrison County · Woodlawn S. (Pettit) field · Producing  · Vertical

John. T. Favell ET AL #1 (API 42-203-35223) is a well in Harrison County operated by Brammer Engineering Inc., completed December 13, 2025 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 18, 2014, permitted to 6,900 ft.

It was permitted by Sklar Exploration Company LLC and has since transferred to Brammer Engineering Inc. on the wellbore schedule.

Completion filings report 10 formation tops, including Nacatoch, Blossom, Woodbine, Goodland.

Its lease has reported 11.3K barrels of oil since August 2014, last reporting in July 2026.

Operator of record

Brammer Engineering Inc.

Permitted by Sklar Exploration Company LLC; the EWA schedule now lists a different operator.

Shreveport, LA · P-5 Y, filed Nov 4, 2025 · 194 permits on file · (800) 865-2708

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBrammer Engineering Inc.
Production reportsBrammer Engineering, Inc.through Apr 2026
Latest permitSklar Exploration Company LLCJul 18, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,900
total depth, ft
1
permits on file
Jul 18, 2014
last permit issued
Dec 13, 2025
completed
11.3K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 13, 2025
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
John. T. Favell et AL O-6-15412Woodlawn, S. (Pettit)Brammer Engineering, Inc.111.3K0Aug 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 865 · prior 12 830(+4%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sklar Exploration Company LLCDec 2014 → Oct 2021
  2. 2Brammer Engineering, Inc.Nov 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
787530-99DrillSklar Exploration Company LLCMay 20, 2014Jul 18, 2014Aug 7, 20146,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-15412————

Formation tops

As filed on W-2/G-1. Subsea from 214 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch1,270-1,056
NacatochNACATOCH - OVER PRESSURED, WATER1,270-1,056
Blossom2,391-2,177
Woodbine2,650-2,436
Goodland3,373-3,159
Paluxy3,551-3,337
Glen Rose3,900-3,686
Rodessa5,720-5,506
PettitPETTET6,390-6,176
Cotton Valley——
Travis Peak——

Perforations

Perforated and open-hole intervals.

FromToType
6,4666,472Perforated
6,4666,532Perforated
6,4746,478Perforated
6,5036,506Perforated
6,5116,519Perforated
6,5266,532Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62571712.5700 S
5.56,6908.75915 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 23, 2026Jan 5, 2026—
00Oct 30, 2015Jul 30, 2015Yes
00Oct 29, 2015Mar 25, 2015—
00Jun 22, 2015Jan 9, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20335223, documented in the API reference.