WELL · 42-205-30317 · DISTRICT 10

Frantz #3

N

Hartley County · Texas Capital Doors (BRN Dolo) field  · Vertical

Frantz #3 (API 42-205-30317) is a well in Hartley County operated by Frantz Resource Management LLC, completed December 8, 2009.

The RRC has issued 2 drilling permits between 2009 and 2010, permitted to 7,800 ft.

It was permitted by Cambridge Production, Inc. and has since transferred to Frantz Resource Management LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Granite Wash, Morrow, Pennsylvanian.

Its 2 leases have reported 207K barrels of oil since March 2008, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Frantz Resource Management LLC

Permitted by Cambridge Production, Inc.; the EWA schedule now lists a different operator.

Hartley, TX · P-5 Y, filed Dec 4, 2025 · (806) 333-4583

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFrantz Resource Management LLC
Production reportsFrantz Resource Management, LLCthrough Mar 2026
Latest permitCambridge Production, Inc.Mar 29, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,800
total depth, ft
2
permits on file
Mar 29, 2010
last permit issued
Dec 8, 2009
completed
207K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 8, 2009
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Frantz O-14-7847Texas Capital Doors (BRN Dolo)Frantz Resource Management, LLC300Mar 2008 – Jul 2026
Frantz O-14-8130Texas Capital Doors (Granite W)Frantz Resource Management, LLC2207K0Dec 2009 – Jul 2026

Oil, barrels lease total

Last 12 months 750 · prior 12 838(-11%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cambridge Production, Inc.Dec 2009 → Jan 2020
  2. 2Frantz Resource Management, LLCJan 2021 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
693583-99RecompletionCambridge Production, Inc.Mar 26, 2010Mar 29, 2010Sep 27, 20097,700
684743-99DrillCambridge Production, Inc.Sep 2, 2009Sep 3, 2009Sep 27, 20097,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-14-7847————
—— O-14-8130————

Formation tops

As filed on W-2/G-1. Subsea from 3,907 ft elevation.Download CSV →

FormationMD ftSubsea
Granite Wash6,470-2,563
Morrow7,026-3,119
PennsylvanianPENN SHALE7,441-3,534

Perforations

Perforated and open-hole intervals.

FromToType
6,4706,476Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37570817.5800 S
9.6252,69212.25700 S
5.57,5808.75350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 29, 2010Mar 29, 2010Yes
00May 5, 2010Dec 28, 2009Yes
00Apr 8, 2010Dec 28, 2009Yes
00Feb 4, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20530317, documented in the API reference.