WELL · 42-205-30324 · DISTRICT 10
Dreams of Oil #1012
Hartley County · Hartley SE (Granite Wash 6669) field · Shut IN · Vertical
Dreams Of Oil #1012 (API 42-205-30324) is a well in Hartley County operated by Fortay Inc., completed June 2, 2010 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued March 16, 2010, permitted to 8,000 ft.
Completion filings report 6 formation tops, including Panhandle Lime, Brown Dolomite, Missourian, Missourian Gr Wash.
Its lease has reported 333K barrels of oil since June 2010, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Sunray, TX · P-5 Y, filed Jan 4, 2026 · 59 permits on file · (806) 930-4533
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fortay Inc. |
| Production reports | Fortay, Inc.through Jan 2026 |
| Latest permit | Fortay, Inc.Mar 16, 2010 |
- 8,000
- total depth, ft
- 2
- permits on file
- Mar 16, 2010
- last permit issued
- Jun 2, 2010
- completed
- 333K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 2, 2010
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dreams of Oil O-14-8180 | Hartley, SE (Granite Wash 6669) | Fortay, Inc. | 2 | 333K | 0 | Jun 2010 – Jul 2026 |
Oil, barrels lease total
Last 12 months 965 · prior 12 1,733(-44%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fortay, Inc.Jun 2010 → Jan 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 692847-98 | Drill | Fortay, Inc. | Jun 2, 2010 | Mar 16, 2010 | Apr 24, 2010 | 8,000 |
| 692847-99 | Drill | Fortay, Inc. | Mar 13, 2010 | Mar 16, 2010 | Apr 24, 2010 | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-8180 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,921 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Panhandle Lime | 3,710 | 211 |
| Brown Dolomite | 3,884 | 37 |
| Missourian | 6,588 | -2,667 |
| Missourian GR Wash | 6,669 | -2,748 |
| Des Moines | 6,970 | -3,049 |
| Des MoinesDES MOINES GR WASH | 7,076 | -3,155 |
| Ellenburger | 7,384 | -3,463 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,669 | 6,675 | Perforated |
| 6,678 | 6,686 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 662 | 17.5 | 650 S |
| 9.625 | 2,552 | 13.5 | 1,390 S |
| 5.5 | 6,909 | 7.875 | 150 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 18, 2011 | Jul 16, 2010 | Yes |
| 00 | Dec 20, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-205-30324 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-205-30324 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.