WELL · 42-207-00488 · DISTRICT 7
Hendrick -8- #1
Haskell County · Haskell County Regular field · Vertical
Hendrick -8- #1 (API 42-207-00488) is a plugged well in Haskell County, plugged June 13, 2006, last operated by Kendrick Oil And Gas Company.
The RRC has issued one drilling permit, issued July 13, 1983, permitted to 3,450 ft.
It was permitted by Monroe Oil & Gas and has since transferred to Kendrick Oil And Gas Company on the wellbore schedule.
Completion filings report 5 formation tops, including B/Coleman Junction, Saddle Creek, King, Palo Pinto.
Its lease has reported 4.53K barrels of oil and 22 mcf of gas since January 1993, last reporting in January 2013.
Operator of record
Permitted by Monroe Oil & Gas; the EWA schedule now lists a different operator.
Abilene, TX · P-5 Y, filed Mar 4, 2026 · 18 permits on file · (325) 698-0191
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Kendrick Oil and Gas Company |
| Production reports | Schkade, Louisthrough Sep 2000 |
| Latest permit | Monroe Oil & GasJul 13, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,450
- total depth, ft
- 1
- permits on file
- Jul 13, 1983
- last permit issued
- Sep 8, 1983
- completed
- 4.53K
- cumulative oil, bbl
- 22
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 8, 1983
- Shut in
- —
- Plugged
- Jun 13, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hendrick -8- O-8-20548 | Haskell County Regular | Kendrick Oil and Gas Company | 1 | 4.53K | 22 | Jan 1993 – Jan 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Schkade, LouisJan 1993 → Sep 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 201807-99 | Other | Monroe Oil & Gas | Nov 4, 1983 | Jul 13, 1983 | — | 3,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-20548 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,639 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| B/Coleman Junction | 907 | 732 |
| Saddle Creek | 1,463 | 176 |
| King | 1,835 | -196 |
| Palo PintoPALO PINTO LM. | 3,197 | -1,558 |
| Palo PintoPALO PINTO SD. | 3,296 | -1,657 |
| StrawnSTRAWN LM. | 3,428 | -1,789 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,390 | 3,408 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 107 | 11 | — |
| 4.5 | 3,508 | 7.875 | 190 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 19, 1984 | Sep 27, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-207-00488 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-207-00488 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20700488, documented in the API reference.