WELL · 42-207-01404 · DISTRICT 7

Wiggins G. et UX #2

Plugged

Haskell County · Stamford NW. (Canyon Lime) field  · Vertical

Wiggins G. ET UX #2 (API 42-207-01404) is a plugged well in Haskell County, plugged February 10, 1997, last operated by Texas United Geoproduction Inc..

The RRC has issued 2 drilling permits (amended twice) between 1987 and 1990, permitted to 2,499 ft.

Completion filings report 4 formation tops, including Saddle Creek, Crystal Falls, Breckenridge, Swastika Sand.

Its 2 leases have reported 773 barrels of oil and 18 mcf of gas since January 1993, last reporting in April 1997. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Texas United Geoproduction Inc.

Abilene, TX · P-5 Y, filed Nov 6, 2015 · 86 permits on file · (325) 692-2219

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexas United Geoproduction Inc.
Production reportsTexas United Geoproduction, Inc.through Oct 1995
Latest permitTexas United Geoproduction, Inc.Apr 4, 1990
2,499
total depth, ft
4
permits on file
Apr 4, 1990
last permit issued
Apr 6, 1988
completed
773
cumulative oil, bbl
18
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 6, 1988
Shut in
—
Plugged
Feb 10, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wiggins, G. et UX O-8-22686Stamford, NW. (Canyon Lime)Texas United Geoproduction, Inc.277318Jan 1993 – Apr 1997
— O-8-24919——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texas United Geoproduction, Inc.Jan 1993 → Oct 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
371626-98RecompletionTexas United Geoproduction, Inc.Apr 27, 1992Apr 4, 1990Mar 25, 19882,499
371626-99RecompletionTexas United Geoproduction, Inc.Mar 30, 1990Apr 4, 1990—2,499
331478-98ReenterTexas United Geoproduction, Inc.May 9, 1988Jun 18, 1987—2,470
331478-99ReenterTexas United Geoproduction, Inc.Jun 11, 1987Jun 18, 1987—2,472

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-22686————
—— O-8-24919————

Formation tops

As filed on W-2/G-1. Subsea from 1,483 ft elevation.Download CSV →

FormationMD ftSubsea
Saddle Creek1,985-502
Crystal Falls2,166-683
Breckenridge2,258-775
Swastika Sand2,460-977

Perforations

Perforated and open-hole intervals.

FromToType
2,2892,292Perforated
2,4612,495Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7511312—
4.52,4537—
72,4568.7550 S
4.52,4617—
72,7568.7550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 7, 1992Nov 2, 1988—
00Jun 9, 1992——
00Jun 17, 1988May 12, 1988Yes
00Jun 9, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
10.5K
bbl, all reported
Sep 1996
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000063702H-1 InjectionPlugged Feb 26, 19971501,0002,450–2,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 500(-100%)

05010015019951996

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20701404, documented in the API reference.