WELL · 42-207-31180 · DISTRICT 7
Haynes #1
Haskell County · Vertical
Haynes #1 (API 42-207-31180) is a plugged well in Haskell County, plugged December 4, 1981, last operated by Allegro Investments, Inc..
The RRC has issued 3 drilling permits (amended once) between 1981 and 2012, permitted to 6,500 ft.
Completion filings report one formation top, including Strawn.
Its 2 leases have reported 79.8K barrels of oil since October 2009, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Victoria, TX · P-5 Y, filed Oct 2, 2020 · 298 permits on file · (361) 573-5619
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Sue-Ann Operating, L.C.through Apr 2026 |
| Latest permit | Allegro Investments, Inc.Oct 15, 2012 |
- 6,500
- total depth, ft
- 4
- permits on file
- Oct 15, 2012
- last permit issued
- —
- completed
- 79.8K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Dec 4, 1981
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haynes O-8-30966 | Harrison (Strawn) | Sue-Ann Operating, L.C. | 4 | 79.8K | 0 | Apr 2012 – Jul 2026 |
| Haynes O-8-30773 | Wildcat | Allegro Investments, Inc. | 1 | 0 | 0 | Oct 2009 – Feb 2014 |
Oil, barrels lease total
Last 12 months 1,211 · prior 12 1,917(-37%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Allegro Investments, Inc.Apr 2012 → Nov 2020
- 2Sue-Ann Operating, L.C.Dec 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 748390-99 | Recompletion | Allegro Investments, Inc. | Sep 17, 2012 | Oct 15, 2012 | Nov 3, 2011 | 6,058 |
| 628217-98 | Reenter | Allegro Investments, Inc. | Apr 27, 2007 | Oct 30, 2006 | Nov 20, 2006 | 6,500 |
| 628217-99 | Reenter | Allegro Investments, Inc. | Oct 27, 2006 | Oct 30, 2006 | — | 6,100 |
| 141735-99 | Drill | Thompson, John R. Operating, Inc | Nov 30, 1981 | Nov 30, 1981 | — | 5,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-30773 | — | — | — | — |
| — | — O-8-30966 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,621 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Strawn | 4,876 | -3,255 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,876 | 4,892 | Perforated |
| 4,902 | 4,909 | Perforated |
| 4,913 | 4,921 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,701 | 13.75 | 150 S |
| 7 | 4,999 | 8.75 | 150 S |
| 5.5 | 5,238 | 7.875 | 165 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 18, 2014 | Oct 17, 2012 | — |
| 00 | Oct 21, 2011 | Mar 2, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-207-31180 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-207-31180 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20731180, documented in the API reference.