WELL · 42-207-32185 · DISTRICT 7

Werewolf SW (Burson Sand) Unit #2

Plugged

Haskell County · Werewolf SW. (Burson Sand) field  · Vertical

Werewolf SW (Burson Sand) Unit #2 (API 42-207-32185) is a plugged well in Haskell County, plugged August 3, 2009, last operated by Star Production Inc..

The RRC has issued one drilling permit, issued March 2, 1992, permitted to 5,990 ft.

It was permitted by Brittany Drilling CO. and has since transferred to Star Production Inc. on the wellbore schedule.

Completion filings report one formation top, including Burson Sand.

Its 3 leases have reported 312K barrels of oil and 210K mcf of gas since January 1993, last reporting in July 2012. The leases carry 11 wells, so these are lease totals, not this well alone.

Operator of record

Star Production Inc.

Permitted by Brittany Drilling Co.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jan 5, 2026 · 192 permits on file · (214) 213-8656

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStar Production Inc.
Production reportsStar Production, Inc.through May 2011
Latest permitBrittany Drilling Co.Mar 2, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,990
total depth, ft
1
permits on file
Mar 2, 1992
last permit issued
—
completed
312K
cumulative oil, bbl
210K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Aug 3, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 11 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Werewolf SW (Burson Sand) Unit O-8-27697Werewolf, SW. (Burson Sand)Star Production, Inc.8232K91.4KNov 1995 – Jul 2012
Atkins, C. A. O-8-26302Werewolf, SW. (Burson Sand)Star Production, Inc.379.9K119KJan 1993 – Feb 1996
— O-8-26349——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Brittany Drilling Co.Jan 1993 → Aug 1993
  2. 2Star Production, Inc.Sep 1993 → Dec 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
396408-99DrillBrittany Drilling Co.Feb 3, 1992Mar 2, 1992Mar 22, 19925,990

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-26302————
—— O-8-26349————
—— O-8-27697————

Formation tops

As filed on W-2/G-1. Subsea from 1,630 ft elevation.Download CSV →

FormationMD ftSubsea
Burson Sand4,920-3,290

Perforations

Perforated and open-hole intervals.

FromToType
4,9204,939Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513712.5100 S
5.54,9227.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 5, 1995——
00Jun 15, 1992Apr 23, 1992Yes
00Jun 5, 1992——
00Apr 30, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093320H-1 InjectionPlugged Feb 24, 20107502,4004,920–4,939

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20732185, documented in the API reference.