WELL · 42-207-32228 · DISTRICT 7
Cloud Sallie E. -A- #9
Haskell County · Herrin (Burson Sand Upper) field · Vertical
Cloud Sallie E. -A- #9 (API 42-207-32228) is a well in Haskell County operated by Cross Timbers Operating Company, completed May 8, 1993.
The RRC has issued one drilling permit, issued March 8, 1993, permitted to 5,000 ft.
Completion filings report one formation top, including Burson Sand.
Its 2 leases have reported 712K barrels of oil and 43 mcf of gas since January 1993, last reporting in July 2026. The leases carry 23 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 43.2K barrels injected in the 12 months reported through September 2025.
Operator of record
Cross Timbers Operating Company
Fort Worth, TX · P-5 Y, filed Feb 9, 2001 · 663 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cross Timbers Operating Company |
| Production reports | L.C.S. Production Companythrough Apr 2026 |
| Latest permit | Cross Timbers Operating CompanyMar 8, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 1
- permits on file
- Mar 8, 1993
- last permit issued
- May 8, 1993
- completed
- 712K
- cumulative oil, bbl
- 43
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 8, 1993
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 23 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cloud (Strawn Sand) Unit O-8-27593 | Herrin (Burson Sand, Upper) | Iron Bell Operating, LLC | 17 | 635K | 12 | Aug 1995 – Jul 2026 |
| Cloud, Sallie E. -A- O-8-8286 | Herrin (Burson Sand, Upper) | Cross Timbers Operating Company | 6 | 77.4K | 31 | Jan 1993 – Dec 1995 |
Oil, barrels lease total
Last 12 months 1,033 · prior 12 2,024(-49%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cross Timbers Operating CompanyJan 1993 → Mar 2000
- 2Falcon Creek Resources, Inc.Apr 2000 → Jul 2000
- 3Sapient Energy CorpAug 2000 → Jan 2002
- 4Chesapeake Operating, Inc.Feb 2002 → Aug 2012
- 5Enervest Operating, L.L.C.Sep 2012 → Apr 2014
- 6Foundation Energy Management LLCMay 2014 → Nov 2022
- 7L.C.S. Production CompanyDec 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 409531-99 | Drill | Cross Timbers Operating Company | Mar 4, 1993 | Mar 8, 1993 | Apr 6, 1993 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-8286 | — | — | — | — |
| — | — O-8-27593 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,660 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Burson Sand | 4,836 | -3,176 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,845 | 4,867 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 133 | 12.25 | 85 S |
| 8.625 | 136 | 12.25 | 85 S |
| 5.5 | 4,954 | 7.875 | 1,020 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 13, 2008 | Nov 19, 2007 | — |
| 00 | Dec 11, 1995 | May 21, 1993 | Yes |
| 00 | Nov 10, 1995 | May 21, 1993 | Yes |
| 00 | Jul 17, 1995 | May 21, 1993 | Yes |
| 00 | Jul 12, 1993 | May 21, 1993 | Yes |
| 00 | Jun 4, 1993 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-207-32228 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-207-32228 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 43.2K
- bbl, last 12 reported months
- 1.09M
- bbl, all reported
- Sep 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000083541 | H-1 Injection | Active | 2,000 | 2,000 | 4,845–4,867 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 43,208 · prior 12 11,947(+262%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20732228, documented in the API reference.