WELL · 42-207-32290 · DISTRICT 8

Early-6 #1

Plugged

Haskell County  · Vertical

Early-6 #1 (API 42-207-32290) is a plugged well in Haskell County, plugged January 21, 1999, last operated by Neeley, June.

The RRC has issued 2 drilling permits between 1995 and 1999, permitted to 5,600 ft.

Operator of record

Neeley, June

Mineral Wells, TX · P-5 Y, filed Jun 8, 2007 · 6 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitNeeley, JuneJan 13, 1999
5,600
total depth, ft
2
permits on file
Jan 13, 1999
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jan 21, 1999

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
482013-99ReenterNeeley, JuneJan 13, 1999Jan 13, 1999Jan 12, 19995,000
434963-99DrillEnserch Exploration, IncApr 17, 1995Apr 17, 1995Apr 20, 19955,600

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20732290, documented in the API reference.