WELL · 42-207-32300 · DISTRICT 7
Teichelman Billy & Larry #1
Haskell County · Sagerton South field · Producing · Vertical
Teichelman Billy & Larry #1 (API 42-207-32300) is a well in Haskell County operated by Rister Oil&Gas International LLC, completed November 9, 1995 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued July 31, 1995, permitted to 2,999 ft.
It was permitted by Rister, Dewey and has since transferred to Rister Oil&Gas International LLC on the wellbore schedule.
Completion filings report one formation top, including Gunsight.
Its lease has reported 6.37K barrels of oil since October 1995, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Rister Oil&gas International LLC
Permitted by Rister, Dewey; the EWA schedule now lists a different operator.
Eastland, TX · P-5 Y, filed Mar 4, 2026 · 3 permits on file · (325) 669-7661
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rister Oil&gas International LLC |
| Production reports | Rister Oil&gas International LLCthrough Apr 2026 |
| Latest permit | Rister, DeweyJul 31, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,999
- total depth, ft
- 1
- permits on file
- Jul 31, 1995
- last permit issued
- Nov 9, 1995
- completed
- 6.37K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1995 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 9, 1995
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Teichelman, Billy & Larry O-8-27702 | Sagerton, South | Rister Oil&gas International LLC | 2 | 6.37K | 0 | Oct 1995 – Jul 2026 |
Oil, barrels lease total
Last 12 months 46 · prior 12 195(-76%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rister, DeweyOct 1995 → Feb 1996
- 2Rister Oil&gas International LLCDec 2013 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 438271-99 | Drill | Rister, Dewey | Jul 27, 1995 | Jul 31, 1995 | Sep 1, 1995 | 2,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-27702 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,892 | 2,902 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 102 | 12.25 | 60 S |
| 5.5 | 2,892 | 7.875 | 390 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 11, 1996 | Nov 16, 1995 | Yes |
| 00 | Dec 13, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-207-32300 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-207-32300 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20732300, documented in the API reference.