WELL · 42-207-32422 · DISTRICT 7

South Lane #2

Plugged

Haskell County · Haskell South field  · Vertical

South Lane #2 (API 42-207-32422) is a plugged well in Haskell County, plugged October 1, 2014, last operated by Langford Production Company LLC.

The RRC has issued one drilling permit, issued July 19, 1999, permitted to 3,900 ft.

It was permitted by Centaur Petroleum Corporation and has since transferred to Langford Production Company LLC on the wellbore schedule.

Completion filings report one formation top, including Palo Pinto.

Its lease has reported 46.2K barrels of oil since March 1999, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Langford Production Company LLC

Permitted by Centaur Petroleum Corporation; the EWA schedule now lists a different operator.

Haskell, TX · P-5 Y, filed Jun 4, 2026 · (940) 256-1078

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLangford Production Company LLC
Production reportsCentaur Petroleum Corporationthrough Oct 2009
Latest permitCentaur Petroleum CorporationJul 19, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,900
total depth, ft
1
permits on file
Jul 19, 1999
last permit issued
Sep 26, 1999
completed
46.2K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 26, 1999
Shut in
—
Plugged
Oct 1, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
South Lane O-8-28582Haskell, SouthLangford Production Company, LLC246.2K0Mar 1999 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Centaur Petroleum CorporationMar 1999 → Oct 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
485875-99DrillCentaur Petroleum CorporationJul 15, 1999Jul 19, 1999Jul 21, 19993,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-28582————

Formation tops

As filed on W-2/G-1. Subsea from 1,505 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO LIME3,585-2,080

Perforations

Perforated and open-hole intervals.

FromToType
3,5853,605Perforated
3,6203,640Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513512.25100 S
5.53,5857.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 14, 2004——
00Jan 19, 2000Oct 4, 1999—
00Dec 9, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
3.56M
bbl, all reported
Sep 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089231H-1 InjectionPlugged Oct 31, 20142,5001,4003,584–3,680

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120132014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20732422, documented in the API reference.