WELL · 42-211-30028 · DISTRICT 10

Frass #2107

N

Hemphill County · Canadian NW. (Morrow Lo.) field  · Vertical

Frass #2107 (API 42-211-30028) is a well in Hemphill County operated by Diamond Shamrock Exploration CO., completed December 18, 1969.

The RRC has issued one drilling permit, issued October 31, 1997, permitted to 12,161 ft.

It was permitted by Midgard Energy Company and has since transferred to Diamond Shamrock Exploration CO. on the wellbore schedule.

Completion filings report 8 formation tops, including Brown Dolo, Douglas, Tonkawa, Kc.

No lease production has been reported under this well’s leases.

Operator of record

Diamond Shamrock Exploration Co.

Permitted by Midgard Energy Company; the EWA schedule now lists a different operator.

Amarillo, TX · P-5 Y, filed Jul 8, 1992 · 328 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiamond Shamrock Exploration Co.
Production reportsMmgl Txph, LLCthrough Jan 2026
Latest permitMidgard Energy CompanyOct 31, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,161
total depth, ft
1
permits on file
Oct 31, 1997
last permit issued
Dec 18, 1969
completed
0
cumulative oil, bbl
518K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 18, 1969
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Frass -107- G-14-166103Canadian, NW. (Morrow, Lo.)Mmgl Txph, LLC10517KJun 1996 – Jul 2026
Frass G-14-54063Canadian, NW (Douglas)Crescendo Resources, L.P.101.05KJan 1993 – Jun 1998

Gas, mcf lease total

Last 12 months 95 · prior 12 528(-82%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maxus Exploration CompanyJan 1993 → Jan 1995
  2. 2Midgard Energy CompanyMar 1995 → Apr 1996
  3. 3Crescendo Resources, L.P.Jan 1997 → Mar 2000
  4. 4Amoco Production CompanyApr 2000 → Dec 2001
  5. 5BP America Production CompanyJan 2002 → Feb 2020
  6. 6Blackbeard Operating, LLCMar 2020 → Sep 2023
  7. 7Mmgl Txph, LLCOct 2023 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
465644-99RecompletionMidgard Energy CompanyJul 30, 1997Oct 31, 1997Apr 23, 199612,161

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-54063————
—— G-14-166103————

Formation tops

As filed on W-2/G-1. Subsea from 2,531 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolo3,704-1,173
Douglas6,603-4,072
Tonkawa7,310-4,779
KC7,838-5,307
Cleve8,462-5,931
Des Moines8,845-6,314
NW10,598-8,067
SQ Belly11,590-9,059

Perforations

Perforated and open-hole intervals.

FromToType
6,7346,669Perforated
6,7346,738Perforated
11,96411,984Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1694—200 S
8.6251,25611425 S
8.6251,256—425 S
5.511,8987.8751,600 S
5.511,898—1,600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 11, 1998May 14, 1997Yes
00Jan 30, 1998——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21130028, documented in the API reference.